How to price a renovation without losing money
Pricing by materials, labor, subcontractors, contingency, cash flow and target profit, with a method you can repeat.
Read
RBM knowledge center
Correct pricing takes a breakdown of the work, costs, a contingency, payments and change orders.

Renovation pricing is where it is decided whether the project will make money, before the crew even walks onto the site. A price that is too low erodes the profit throughout the job, and a price built without detail opens the door to arguments over what is included. This hub collects the material that helps you build a price that holds: from the site visit to a detailed quote the client understands.
The method that repeats in the guides is simple: break the work into line items with quantities, calculate materials, labor and subcontractors separately, add a visible contingency and a target profit, and state explicitly what is not included. After the work, compare the actual cost with the pricing so the next quote is more accurate.
The calculators here give you a reference point for the calculation, not a price list. The right price for your job depends on the property, the crew, the materials and the risk, so it is worth entering the figures from your own projects.
Pricing does not end when the quote is sent. Changes during the work need to be priced the same way, so the guides here also connect to managing change orders and tracking budget overruns.
The guide to pricing without losing money explains the structure: line items, costs, contingency and target profit.
The bill of quantities guide shows how to turn a general job into a list of line items with quantities.
The pricing calculator and the materials cost calculator give a quick check for each line item.
The template and the guide to writing a quote connect the calculation to a document the client understands.
Pricing by materials, labor, subcontractors, contingency, cash flow and target profit, with a method you can repeat.
ReadWhere the profit disappears before you even start: a five-step process, a checklist and an example of two quotes for the same bathroom.
ReadWhat a bill of quantities is, how to build it by line items, units of measure and quantities, and how it prevents arguments.
ReadWhat to gather before the quote, how to price, which terms to include and how to follow up after sending.
ReadA visible contingency, tracking spending against progress, managing changes and checking the target profit.
ReadThe structure that replaces a guess with a calculated price, line item by line item.
ReadBuild a price from area, cost per square meter, contingency and target profit, as a reference point for the quote.
ReadA quote structure with client details, work items, materials, terms and a payment schedule.
ReadMaterials cost by area, price per square meter, waste and delivery, including a billing price with a profit markup.
ReadTurn a labor cost into a quote price with a profit markup and VAT, through to the final price for the client.
ReadQuotes with line items, versions and payment terms, linked to the lead and the project.
ReadA comparison between the pricing and the actual costs, with a profitability report for each project.
ReadQuotes from your price list, checked as you write them, even without a CRM.
ReadA price list gives a reference point. Real pricing has to take into account the project, the crew, the materials, cash flow and risk.
The reliable way is to compare against your own projects: how much each line item actually cost and how much was left at the end. If the profit keeps getting eroded on similar projects, or you close almost every quote you send, it is worth checking your pricing.
It is worth showing line items, quantities and what is not included, so the client understands what they are paying for. You do not have to show the internal breakdown of costs and profit in each line item. The quote should be clear, not an open set of books.
Every time a gap shows up between the pricing and the actual cost, and at least whenever material prices or your labor costs change. A price list built from your own projects almost updates itself if you record what each line item cost.
A bill of quantities is the list of line items, quantities and units of measure for the work. A quote adds prices, terms, a payment schedule and what is not included. A good bill of quantities is the basis for an accurate quote, so it is worth building it first.

RBM connects everything that happens in the business, from the first inquiry to the last payment, so you know what needs attention before it turns into a loss.
Start free, no card. RBM Pro at ₪99 + VAT a month when money needs to move.
We use cookies to improve your experience.