A renovation project handover checklist: download, print, sign.

Click the button, then choose "Save as PDF" in the print dialog

Renovation project handover form

This document confirms receipt of the property and protects both sides

RBM · Handover form

A week before handover

  • Walkthrough done without the client
  • Every defect found has been fixed
  • Defects not fixed have been explained to the client
  • Handover date and time sent to the client in writing
  • Warranty documents prepared
  • Tile batch numbers recorded

System checks on handover day

  • Electrics: every socket and switch checked
  • Electrical panel: no tripping
  • Taps: flow and sealing in order
  • Drainage: checked for blockages
  • Air conditioning: cooling and heating in order
  • Doors: open and lock properly
  • Cabinets and drawers: open properly
  • Tiling: no broken tiles or flaws
  • Paint: finished, no stains or gaps

Documents handed to the client

  • Written warranty (start and end dates)
  • Names and phone numbers of the main suppliers
  • Tile batch numbers (for future repairs)
  • Maintenance instructions (if relevant)
  • Materials receipts / manufacturer warranty certificates

Meter readings on handover day

Open defects (to be handled after handover)

1.To be fixed by:
2.To be fixed by:
3.To be fixed by:
4.To be fixed by:

Note: no signature, no handover. If a client refuses to sign, find out why before you leave the site.

I, the undersigned (client), confirm

I received the property on in the condition recorded above. The listed defects will be handled by the dates stated.

Date:

Signature of the contractor who did the work

The property was handed over as agreed. I did a full handover walkthrough with the client and recorded the property's condition.

Date: