What is a renovation quote?

A renovation quote is a working document that sets out costs, the schedule, payment terms and the warranty. A clear document reduces misunderstandings and helps the client understand exactly what they are paying for.

Written by the RBM team · Updated June 2026General information only, not legal, tax or accounting advice.

RBM documents screen with contracts waiting for a signature
Barel Kaminsky, founder of RBM Solutions
Barel Kaminsky, founder of RBM SolutionsBuilt by a renovation contractor, out of real work on site.
  • Strong security
  • Hebrew, Russian and English
  • Works on computer and phone
  • Personal help getting set up

Why a detailed quote matters to both sides

For the client, the quote is the only way to compare contractors. When one quote says "bathroom renovation" and a price, and another lists demolition, waterproofing, floor tiling, wall tiling and sanitary fixtures with quantities, the client understands what they are choosing between, not just what it costs.

For the contractor, the quote is the reference point for everything that happens later. When the client asks for "just a bit more" in the middle of the job, the detailed quote is what shows that it is an addition and not part of the deal. When a payment falls due, the payment schedule in the quote is what prevents an argument.

8 things a renovation quote must include

Contractor and client details
Name, contact details and the relevant business details. It is worth checking with a professional adviser which details are required in your case.
A detailed description of the work
Each job on its own, not just "kitchen renovation", but: removing tiles, tiling, carpentry, painting and the related connections.
Quantities and unit price
Square meters, linear meters, units. A price per unit and a total. It protects both sides.
Final price and VAT
Show the amount before VAT, the VAT and the total, if it applies to the deal. Check the VAT rate and the required presentation with an accountant.
Schedule
Start date, target date and the main milestones. Without an agreed schedule, every delay turns into a hard conversation.
Payment terms
Set milestones and clear amounts instead of general wording like "according to progress".
How long the quote is valid
State until when the quote is valid, especially when material prices or crew availability may change.
Warranty
Spell out what the warranty covers and what it does not. On legal or regulatory matters, it is best to consult a professional.

How to write a renovation quote, step by step

  1. Inspect before you price. Measure, photograph and write down the existing condition. Whatever is not checked on the visit turns into a surprise later, usually at the contractor's expense.
  2. Break the work into items. Each job on its own line, with a unit and a quantity. Demolition, waste removal, plumbing and electrical, waterproofing, finishes and installations, each separately.
  3. Decide who supplies the materials. Write explicitly which materials are included in the price and which the client buys, and to what finish level.
  4. Write what is not included. Clear exclusions, such as moving electrical points or treating damp damage found during demolition, save an argument in the middle of the job.
  5. Build a payment schedule. An advance, payments by stages that can be checked, and the balance on handover. The percentages must add up to 100%.
  6. Set the validity and the terms. Until when the quote is valid, the estimated duration, the warranty and what happens with additions. If the work will start in a few months, consider an index linkage clause.
  7. Send and follow up. Send it as a link or a PDF, check that the quote was opened, and get back to the client after a few days if there is no answer.

Example: the structure of a bathroom renovation quote

This is how the items break down in a quote for a small bathroom. The prices are left out on purpose: every contractor prices by their own costs.

ItemUnitQuantity
Removing the existing floor tiles, wall tiles and sanitary fixtureslump sum1
Construction waste removallump sum1
Replacing the water and drainage pipeslump sum1
Waterproofing the floor and the wall jointsm²5
Floor tilingm²5
Wall tilingm²22
Installing a wall-hung toilet and concealed cisternunit1
Installing a vanity unit, sink and faucetunit1
Installing a shower enclosureunit1

The quantities are for illustration only. A real quote adds a unit price, a total for each item, VAT, a payment schedule and terms.

Common mistakes in renovation quotes

  • One overall price with no breakdown into items
  • "According to progress" instead of milestones with amounts
  • No validity date on the quote, while material prices move
  • No exclusions, so every surprise during demolition turns into an argument
  • Additions agreed on WhatsApp that never made it into any document
  • A quote that was sent and nobody got back to the client after it

How to build a quote in RBM

Three ways to start
From a ready renovation package, by choosing trades, or from a description of the job and photos, from which the AI suggests a draft that you edit before sending.
What you charged last time
Next to each item you see the price you charged before for similar work, so you don't price from memory.
A photo per item
You can take or upload a photo for each line, and the client sees it in the quote.
Payment schedule
Milestones in percentages, with the amount calculated for each one and a warning when the total does not reach 100%.
Terms
Validity, estimated duration, warranty, exclusions, discount, advance and a clause linking to the construction input price index. VAT at 18% or no VAT, depending on the type of business.
Sending and tracking
Send it on WhatsApp or as a link, in Hebrew or Russian according to the client's language, and see how many times the quote was opened and from how many devices, for example when it was forwarded to a spouse.
The client's answer
The client approves, or asks for a change instead of signing. When a signature is required, a one-time code is sent to them before the approval.

A well-organized PDF quote

Instead of Word, Excel and sending by hand, RBM helps you bring together items, quantities, terms and documents so you can send the client a better-organized quote.

Frequently asked questions

What is a renovation quote?

A renovation quote is a working document that sets out the cost of labor and materials, the schedule, the payment terms and the warranty. To know when it becomes a binding document, consult a suitable professional.

What must a renovation quote include?

Contractor and client details, a detailed description of the work, quantities and unit prices, the amount plus 18% VAT, a schedule, payment terms, how long the quote is valid, and the warranty.

How long does it take to prepare a quote?

It depends on the project and on how detailed it needs to be. Templates, an organized bill of quantities and a set process can cut manual work and reduce mistakes.

Is a digital signature legally valid?

There are different kinds of digital signatures and approvals. Before relying on a signature legally, it is best to consult a lawyer.

What is the difference between a quote and a bill of quantities?

A bill of quantities is the list of the work's items, units and quantities. The quote adds prices, VAT, a schedule, a payment schedule, a validity period and a warranty.

What do you do when the client asks for work that was not in the quote?

Open a separate change order with a description, a price and the effect on the schedule, and do the work only after the client approves it in writing. That way it also gets billed.

A renovated apartment at night, warm light in the rooms and a blue line around the floor

Send a better-organized quote

RBM. Start free, no card, and move to Pro when money needs to move.