3D model of a kitchen with a clear document sheet and a blue signature line above it

Quote example

Waterproofing quote: an example with line items for contractors

A waterproofing quote has to say which method, over what area, what is done at penetrations and drains, and how it is tested at the end. The example has 5 items for waterproofing a roof and a balcony. Next to them is the range from RBM's public price list, and you set your own price.

By the RBM team · Updated

Barel Kaminsky, founder of RBM Solutions
Barel Kaminsky, founder of RBM SolutionsBuilt by a renovation contractor, out of real work on site.
  • Strong security
  • Hebrew, Russian and English
  • Works on computer and phone
  • Personal help getting set up

The items in the quote: waterproofing a roof and a balcony

The items in the order the work is done. The quantities are a starting point you correct after measuring. The range in the last column is from RBM's public price list, not your price.

SectionItemQuantityUnitRange in RBM's price list
PreparationCleaning and preparing the base, crack repairs40m²not in the price list
RoofRoof waterproofing with bitumen membranes40m²₪100-150 per m²
BalconyWaterproofing a tiled balcony12m²₪180-650 per m²
DetailsCove fillets and sealing around pipe penetrations and drains1lump sumnot in the price list
TestingFlood test at the end1lump sum₪900-1,500 per test
  • Preparation
    Item
    Cleaning and preparing the base, crack repairs
    Quantity
    40
    Unit
    m²
    Range in RBM's price list
    not in the price list
  • Roof
    Item
    Roof waterproofing with bitumen membranes
    Quantity
    40
    Unit
    m²
    Range in RBM's price list
    ₪100-150 per m²
  • Balcony
    Item
    Waterproofing a tiled balcony
    Quantity
    12
    Unit
    m²
    Range in RBM's price list
    ₪180-650 per m²
  • Details
    Item
    Cove fillets and sealing around pipe penetrations and drains
    Quantity
    1
    Unit
    lump sum
    Range in RBM's price list
    not in the price list
  • Testing
    Item
    Flood test at the end
    Quantity
    1
    Unit
    lump sum
    Range in RBM's price list
    ₪900-1,500 per test

What the quote must say

Method and material. Bitumen membranes, polyurethane or acrylic. Write which, how many layers, and why the method suits the base.

The details. Many leaks start at pipe penetrations and drains, not in the middle of the roof. A separate line for the details shows the client you thought about them.

Flood test. Write that it is done, and when, before anything is covered.

Warranty. For how long and on what. In waterproofing, this is the sentence the client looks for in the quote.

What to write under "not included"

Whatever is not written down as included or not included becomes an argument at the end of the job. Three items that come up again and again in this work:

Removing existing tiles
Waterproofing a tiled balcony sometimes means removing the tiles. Write whether it is included.
Repairs to the base
Damaged concrete or falls that need correcting turn up after cleaning, and are priced separately.
Damp damage inside
Repairing plaster and paint inside the apartment is not part of the waterproofing, unless written otherwise.

Frequently asked questions

How much does roof waterproofing cost per m²?

In RBM's price list, waterproofing with bitumen membranes is ₪100-150 per m², polyurethane waterproofing ₪140-210 per m² and acrylic waterproofing ₪50-130 per m², after suitable preparation of the base.

How much does a flood test cost?

In RBM's price list, a flood test is ₪900-1,500 per test, the test only, without repairing defects. In a waterproofing quote it is a line at the end of the job.

How does the client sign the quote from their phone?

In RBM you send the client a link on WhatsApp. It opens on their phone, they go through the quote and sign with a finger. The signature is saved with a timestamp and the exact version that was signed, so at the end of the job it is clear what they agreed to.

Where the ranges come from

The ranges are from RBM's renovation price list. They are not a quote and not your price; they help you explain the items to the client.

A renovated apartment at night, warm light in the rooms and a blue line around the floor

Your next quote, without starting from a blank page

RBM. Start free, no card, and move to Pro when money needs to move.

We use cookies to improve your experience.