Skip to content

Carpentry and interiors

Carpentry and interiors, from measuring to installation

Carpentry and interiors include wardrobes and sliding closets, bathroom cabinets, TV walls, bookcases and wood paneling made to measure. Most problems don't happen in the workshop but on site: a measurement taken before plastering, an electrical outlet that ends up behind a door, or cheap hardware that can't take daily opening. So first finalize the final wall and ceiling measurements, the electrical and water locations, the type of fronts and how each door opens. Only after that should you approve a drawing and pay a deposit for production.

Bedroom with wood paneling behind the bed
Typical range

3,500-70,000 ₪

by item and custom carpentry

The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.

What's usually included?

  • Measuring and design
  • Production to specification
  • Installing cabinets and paneling
  • Hardware and mechanisms
  • Adjustments and finishing

What affects the price?

  • Type of material and finish
  • Scope and quantity
  • Design complexity
  • Type of hardware
  • Coordination with electrical and plumbing

How does RBM help keep it organized?

  • Pulling together the spec and suppliers
  • Coordinating dimensions and openings
  • Tracking production stages
  • Checking installation and finish

Stages of the work

  1. 01

    Measuring visit and needs

    The carpenter comes to measure, hears what needs to go into each cabinet and checks the condition of the walls and floor. At this stage you agree together on the basic interior layout, the type of material and finish, and what is still planned to change in the room.

  2. 02

    Drawing and specification for approval

    The carpenter prepares a drawing with measurements, layout, opening directions, type of hardware and the color of the fronts, and sometimes brings a material sample. The homeowner approves the drawing in writing, because any change after production starts becomes an extra.

  3. 03

    Final measurement after plastering

    After the walls are plastered, the floor is tiled and the electrical points are in place, the carpenter comes back for a final measurement before cutting. Here you confirm together that the outlets, pipes and air conditioner don't clash with the cabinet body, the doors or the drawers.

  4. 04

    Production in the workshop

    The parts are cut, finished and partly assembled in the workshop, and the hardware is ordered according to the approved specification. Agree in advance whether you'll get photos from production and what happens if a particular material or color isn't in stock.

  5. 05

    Installation on site

    The installation crew brings the parts, levels them, anchors them to the wall and fits the fronts and drawers. The homeowner decides in advance where the parts may be placed and what needs to be cleared from the room, and whether other work is waiting for the installation to finish.

  6. 06

    Adjustments and handover

    At the end of installation, hinges and runners are adjusted, handles are installed and trim strips are closed against the wall and ceiling. Go through every door and drawer together, and write down what still needs to be completed before the final payment.

What to check before you pay

  • Open and close every door and drawer, and check that they close all the way without rubbing and with even gaps along their full length.
  • Make sure the installed hardware, including hinges, runners and soft-close, is the same type that appears in the drawing you approved.
  • Check in daylight that the color and finish of all the fronts are uniform, and that there are no exposed edges or scratches at the corners.
  • Make sure the outlets, switches and shutoff valves inside or behind the cabinet are accessible, and that the cutouts around them are clean and precise.
  • Ask to see that the tall cabinets are anchored to the wall, and that the long shelves don't sag when loaded with books or dishes.

Carpentry and interiors price list by line item

6 line items · updated 11/2026

  • Sliding wardrobe

    2,500-7,000 ₪

    per m² · By hardware, fronts and interior layout.

  • Full wardrobe

    9,000-30,000 ₪

    per unit · For a custom wardrobe, standard to wide.

  • Bathroom vanity

    3,500-14,000 ₪

    per unit · Includes a sink or countertop, per spec.

  • Carpentry TV wall

    8,000-35,000 ₪

    per unit · Includes storage, cladding and custom design.

  • Living room bookcase

    12,000-50,000 ₪

    per unit · By dimensions, material, color and hardware.

  • Furniture assembly

    180-350 ₪

    per hour · For spot jobs that aren't custom carpentry.

Updated November 2026 · price varies by spec and site conditions

See the full price list

Questions about Carpentry and interiors

What affects the price of carpentry?

Mainly the type of material and finish, the quality of the hardware, the complexity of the interior layout and the number of fronts. Cabinets that look similar in a photo can be very different in board thickness, type of runners and edge finishing. So compare quotes only against an identical drawing and specification. Ask for each quote to state the type of board, the type of finish and the type of runners, not just a general description of a made-to-measure cabinet. For example, a quote with soft-close runners and thick edge banding looks expensive next to one with simple runners and thin edge banding, but it's not the same cabinet.

Why is it important to coordinate carpentry with the rest of the work?

A cabinet connects to the walls, the floor, the ceiling, the electrical points and sometimes the water pipes. If the carpenter measures before the plastering and tiling are finished, or if the electrician moves a point after the drawing, the cabinet won't fit as planned. Early coordination prevents cutting on site and delays to the whole schedule. The carpenter should receive the electrical and plumbing plan before drawing. What most often goes wrong: an outlet moved after the drawing ends up behind an interior partition, and the carpenter has to cut the back panel on site or make a part again.

When during the renovation do you bring in the carpenter?

Meet a carpenter as early as the planning stage, so that the electrical, water and air conditioning locations are set according to the cabinets. Production itself starts only after a final measurement in a relatively finished room, and installation comes toward the end, after tiling and a first coat of paint. That way the carpentry isn't damaged by dust and other work. If the carpentry includes a bathroom cabinet, it is also coordinated with the plumber. Ask the carpenter at the first meeting which measurements he needs from you and when, so the final measurement isn't delayed by a wall that hasn't been plastered yet.

What do you do if the cabinet doesn't fit or looks different from the drawing?

First compare what was actually installed with the drawing and specification approved in writing. If the gap comes from a measuring or production error, the fix is usually on the carpenter. If it comes from a change you asked for, or from a wall that moved after the measurement, agree in writing what gets fixed and who pays before going on. For example, if the cabinet falls short of the ceiling because of a measuring error, the gap can sometimes be closed with a trim strip, but if a front won't open because of an outlet or a pipe, a new part has to be made. Ask to see the options in writing.

Can you live at home while the carpentry is made and installed?

Yes, and usually without much difficulty, because most of the work is done in the workshop. During installation there's drilling noise, local dust and large parts in the hallway. Clear the room in advance, protect the floor along the way and agree with the crew where the fronts are placed so they don't get scratched. Also agree in advance on removing the packaging and cardboard. If the installation includes drilling into a shared wall or noisy work, let the neighbors know in advance too. Ask the crew to vacuum at the end and not to leave drilling debris inside the drawers.

How do you take care of the cabinets after installation?

Keep the drawing, the material and color details and the hardware details, so you can order a replacement front or hinge. Wipe with a damp cloth, not a wet one, keep water away from the edges of the bathroom cabinet, and ask the carpenter to show you how to adjust hinges that shift over time. If something comes loose or breaks, contact the carpenter with a photo and the hardware details, which will save an unnecessary visit. In the bathroom and kitchen, check the seal around the sink from time to time, because water that gets into the edge of the board makes it swell, and it can't always be restored.

Related renovation work

Registered renovation contractors by city

Search for a contractor by name or contractor number

Looking for a contractor for carpentry and interiors?

Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.

Build a project file

We use cookies to improve your experience.