Planning, measurements and prep

Planning, measurements and prep before you start

The planning and prep stage sets the foundation for the whole renovation: a walkthrough and utilities check, measuring and an as-is plan, a specification, a bill of quantities and coordinated plans for electrical, plumbing, drywall and flooring. Most costly changes in the middle of a job start with a decision that wasn't settled here, such as an outlet location, a ceiling height or a tile that wasn't chosen in time. So first you define what you want to change and what stays, and then turn that into documents every contractor can price on the same basis. That also makes it easier to spot a quote that is missing something.

Typical range

1,500-45,000 ₪

by scope of planning and prep

The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.

What's usually included?

  • Measurements and documenting existing conditions
  • Defining the scope of work
  • Coordinating plans and points
  • Initial schedule
  • Preparing a materials list

What affects the price?

  • Project scope
  • Plan complexity
  • Number of tradespeople
  • Need for approvals
  • Level of detail in the spec

How does RBM help keep it organized?

  • Collecting requirements and photos
  • Building the spec by line item
  • Coordinating points and plans
  • Approving the baseline before work

Stages of the work

  1. 01

    Walkthrough and existing conditions check

    A pro walks through the property, checks for signs of dampness and the condition of the electrical, plumbing and walls, and hears what the budget and desired scope are. Based on the findings, the homeowner decides whether a more thorough utilities inspection is needed before moving on.

  2. 02

    Measuring and an as-is plan

    Every space is measured, including heights, openings, beams and existing points, and a plan is produced that everyone will work from. The homeowner approves that the plan reflects the property, because every measurement from here on will rely on it.

  3. 03

    Specification and bill of quantities

    The work in each space, the materials and the limits of responsibility are gathered into one organized document and broken down into line items with quantities. The homeowner goes over every line item, marks what is still open and approves a version to send to contractors.

  4. 04

    Coordinating plans and points

    The electrical, water, air conditioning and lighting points are marked on the plan, and checked so they don't clash with cabinets, drywall or furniture. This is where the homeowner decides on final locations, because moving them after walls are opened costs much more.

  5. 05

    Choosing finishing materials

    Tiles, sanitaryware, colors, hardware and countertops are chosen, and the model, quantity and order date are written down for each item. The homeowner decides what they buy themselves and what the contractor supplies, so it appears the same way in every quote.

  6. 06

    Comparing quotes and approving the baseline

    The same spec is sent to several contractors and compared line item by line item, including payment stages and how changes are approved. The homeowner chooses a quote and approves in writing the version of the spec the agreement is signed on, before demolition starts.

What to check before you pay

  • Make sure the as-is plan shows heights, beams, openings and existing points, not just floor dimensions.
  • Check that every line item in the spec has a quantity, material and location, and that no items are left open without a clear definition.
  • Ask to see all the coordinated plans together, and check that an outlet, a cabinet and an AC unit don't land on the same spot on the wall.
  • Make sure every quote you received refers to the same version of the spec, and that anything missing from it is marked, not hidden.
  • Check that the agreement lists the payment stages, what counts as completing each stage, and how a change or addition is approved.

Planning, measurements and prep price list by line item

9 line items · updated 11/2026

  • Professional pre-renovation walkthrough

    500-1,500 ₪

    per visit · Initial inspection of the property, budget questions and scope of work.

  • Measuring and drawing an as-is plan

    1,500-4,500 ₪

    per apartment · Depends on property size, number of spaces and level of detail.

  • Initial spec

    1,500-6,000 ₪

    per project · A document that pulls together the work, spaces, scope and boundaries of responsibility.

  • Renovation bill of quantities

    3,500-12,000 ₪

    per project · Breaking the work into line items and quantities for comparing quotes.

  • Coordinating work plans

    4,000-18,000 ₪

    per project · Bringing together electrical, plumbing, drywall, flooring and finish plans before work starts.

  • Pre-renovation infrastructure check

    1,200-4,500 ₪

    per test · Spot check of electrical, plumbing, damp or wall condition.

  • Apartment home inspection

    1,100-1,900 ₪

    per test · Defect inspection before taking possession or buying, with a findings report.

  • Help choosing finishes

    2,500-9,000 ₪

    per project · Help choosing tiles, fixtures, colors, hardware and surfaces within your budget.

  • Permit prep or planning review

    5,000-45,000 ₪

    per project · Initial range only; excludes fees, consultants or authority requirements.

Updated November 2026 · price varies by spec and site conditions

See the full price list

Questions about Planning, measurements and prep

Why is the planning stage so important?

Because it sets exactly what is included in the work before anyone starts demolition. With a clear spec and plans, you can compare quotes on the same basis, spot a missing line item and know what counts as an addition. Without it, every decision that was put off turns into an argument or a delay in the middle of the renovation. Example: if the spec doesn't set in advance where the shower goes, each contractor prices a different drain location, and the quotes look different even when the work is similar. Once the location is set, comparing becomes much simpler and clearer.

What should be agreed on before work begins?

A written spec by space, a plan with dimensions and points, a materials list showing who buys what, a schedule by stage and payment stages. Just as important is agreeing on how a change is approved: who requests it, how it is priced and when it goes into the work. That way a small change doesn't become a surprise on the bill. A common example: nobody agreed on who buys the sanitaryware, the contractor waits for it, and the plumber arrives to connect points with nothing to connect to them. A list of who supplies each item and when it arrives prevents this.

When should an engineer or architect be involved?

When you move or add walls, open up openings, change a facade or balcony, or when there are cracks and dampness of unclear origin. In cases like these, it is worth consulting an engineer or a licensed professional even before the spec, so the plan is based on an inspection and not an assumption. For a purely cosmetic renovation, a good spec is usually enough. Example: a diagonal crack above a door frame or dampness that keeps coming back in the same wall are signs that a professional should check before anything is tiled or painted over them. Ask them for written findings, so they become part of the spec.

How do I compare quotes that look completely different?

Put them all into the same structure: the same line items, the same quantities and the same materials, and mark in each quote what is missing or written in general terms. A cheap quote that doesn't include debris removal, protection or ancillary materials isn't really cheap. If the gaps are large, ask each contractor to explain the items where they differ. A common mistake: one quote prices flooring by the floor area alone, while another also includes waste, baseboards and prepping the substrate, and so looks more expensive. Ask each contractor how they calculated the quantities.

What do we do if something unplanned turns up in the middle of the renovation?

Stop at that point, document it in photos and ask the contractor for a written description of the problem, the solution and the effect on the price and the schedule. Update the spec and the plan, and continue only after written approval. A good utilities inspection during the prep stage reduces these surprises, even if it doesn't eliminate them. Example: after demolition it turns out the old water pipes are rusted, and the contractor proposes replacing them throughout the apartment. Ask for details of what was found, photos, and the option of partial versus full replacement before approving the addition.

What should I keep from this stage after the renovation is over?

Keep the as-is plan, the final version of the spec, the coordinated plans and the photos of the utilities before they were closed up. These are the documents that will help you with a future repair, a sale or the next renovation, because they show what was done and where every line runs. It is worth keeping them together, including a digital copy. Example: someone buying a renovated apartment usually asks what was done with the electrical and plumbing, and a file with plans and photos answers that without opening walls. A tradesperson who comes for a repair will also know quickly where to work.

Related renovation work

Registered renovation contractors by city

Search for a contractor by name or contractor number

Looking for a contractor for planning, measurements and prep?

Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.

Build a project file

We use cookies to improve your experience.