Skip to content

Smart home, networking and low voltage

Smart home and low voltage: the infrastructure before the walls

Low voltage covers everything that runs through thin cables: network, TV, intercom, cameras, alarm, and preparations for lighting and shutter control. The work itself is relatively simple, but it has to happen before the drywall, plaster and paint, and after that every forgotten point means opening a wall or running a visible cable. Before the electrician starts, decide where the communications cabinet goes, where the screens, cameras and wireless network points will be, and what is only being prepared for the future. Even if the system comes later, the infrastructure needs to be documented.

Typical range

450-45,000 ₪

by points and system

The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.

What's usually included?

  • Planning communication points
  • Low-voltage preparations
  • Network and control points
  • Smart home preparations
  • Labeling and documentation

What affects the price?

  • System scope
  • Number of points
  • Coordination with electrical and drywall
  • Type of control
  • Preparations vs. final installation

How does RBM help keep it organized?

  • Early point plan
  • Coordination with electrical and ceilings
  • Documenting routes and points
  • Checking preparations before closing

Stages of the work

  1. 01

    Planning needs and points

    You go room by room and decide where you need a wired network connection, TV, camera, sensor or shutter control. The homeowners approve a written point plan, including what is installed now and what is only prepared for the future.

  2. 02

    Communications cabinet and routes

    The location of the communications cabinet is set, in an accessible spot with power and ventilation, along with the routes the conduits will take to each room. Coordination with the electrician and the drywall work covers how the low-voltage cables are kept separate from the power cables.

  3. 03

    Laying conduits and pulling cables

    Conduits and boxes are laid in the walls and ceilings, and cables are pulled through or a pull string is left for future cables. Before closing up, the homeowners get photos of the routes and confirm that the points are in the agreed places.

  4. 04

    Testing and documentation before closing

    Each cable is tested from source to destination and labeled at each end, so it is clear where it leads. At this stage you get a map of the points, and you approve closing the walls only after the test has passed.

  5. 05

    Installing and connecting equipment

    After painting, outlets, intercom screens, cameras, controllers and the equipment in the communications cabinet are installed, and everything is connected to the network. You decide together where the router sits, who sets up the system and which accounts and passwords stay with the homeowners.

  6. 06

    Training and handover

    The contractor shows how each system works, what to do when something stops responding and how to reset equipment. The homeowners approve the handover only after checking every point themselves and receiving the full documentation.

What to check before you pay

  • Make sure you have an up-to-date point plan with photos of the routes in the walls, before the drywall and plaster are closed.
  • Check that every cable is labeled in the communications cabinet and at the outlet, and that the label matches the room name in the plan you received.
  • Ask to see a test of every network point, and plug in a device yourself at a few outlets to make sure there is a connection.
  • Make sure the communications cabinet has power, free space and ventilation, and that the cables are neatly arranged and not hanging in a tangle.
  • Check that the admin passwords, app accounts and equipment details were given to you in writing and did not stay only with the installer.

Smart home, networking and low voltage price list by line item

8 line items · updated 11/2026

  • RJ45 network point

    300-650 ₪

    per point · Wiring, outlet and basic testing, by distance and access.

  • Apartment network cabinet

    1,200-4,500 ₪

    per unit · Includes cable management, a patch panel and basic infrastructure.

  • Smart home prep

    8,000-28,000 ₪

    per apartment · Infrastructure, boxes, cables and prep for future control.

  • Smart lighting or shutter controller

    450-1,500 ₪

    per unit · Excludes unusual electrical changes or a central system.

  • Video intercom

    2,500-9,000 ₪

    per system · Depends on the number of screens, camera, wiring and gate.

  • Security cameras

    4,000-16,000 ₪

    per system · Usually 4-8 cameras, NVR, wiring and installation.

  • Basic alarm system

    3,500-12,000 ₪

    per system · Sensors, control panel, keypads and infrastructure coordination.

  • Network infrastructure check and documentation

    600-2,500 ₪

    per test · Mapping points, testing cables and recommendations before closing up.

Updated November 2026 · price varies by spec and site conditions

See the full price list

Questions about Smart home, networking and low voltage

When do you prepare the infrastructure for a smart home?

Before the walls and ceilings are closed, meaning at the same stage when the electrician lays their conduits. After the drywall and plaster, every addition requires opening up, patching and painting, or a visible cable on the wall. So it is worth deciding on the points already at the planning stage, even if the equipment itself arrives much later. A pull string in an empty conduit lets you run a cable later without opening a wall. For example, a TV on the wall needs a concealed conduit down to the cabinet below it, otherwise the cables stay hanging in plain sight even after the whole renovation is finished.

Do you need the whole system up front?

Not necessarily. You can prepare conduits, boxes and pull strings now, and decide on the equipment when the budget and needs are clear. What matters is that the infrastructure reaches every place where you might want control, a camera or a wired connection, because an empty preparation is much cheaper than opening a wall. For example, preparing for shutter control usually needs a deep box next to each shutter and a suitable cable from the panel, and if this was not prepared before the plaster, adding it later is much more complicated. Ask the electrician to mark on the plan what was prepared and where.

Doesn't a wireless network replace wiring?

In most homes a wired connection is still worth having for the important points: TV, workstation, cameras and access points for the wireless network. Concrete walls and rooms at the far end of the home hurt reception, and a wired connection to an access point solves this better than a range extender. Plan the location of the access points together with the other points. Outdoor cameras also work more reliably with a cable. Ask for the plan to show where each access point will be and how the cable reaches it from the communications cabinet, especially in rooms at the far end of the home and on the balcony.

What should you buy yourself and what should you leave to the contractor?

You can choose the visible equipment, such as screens, cameras or speakers, yourself, as long as the contractor confirms it suits the infrastructure and the system. It is better for the contractor to supply and document the cables, boxes and conduits. Agree in advance who is responsible if equipment you bought does not work with what has already been installed. Keep the invoices and details of the equipment you bought, so it is easy to deal with a fault. A common mistake is buying a camera or intercom that does not suit the cable that was laid, and finding out only during connection, when the walls are already closed.

How do you compare quotes for low voltage and smart home work?

Ask each contractor for a list of points by room, showing what is actually installed and what is only prepared. Check whether the communications cabinet, testing and documentation are included, and whether system setup and training are part of the quote. A quote that gives only a total amount, without a list of points, is very hard to compare. It is also worth asking what happens if an extra point turns out to be needed in the middle of the work. Compare the cable type and the testing method too, because a cheap quote may be based on a simpler cable without a documented test of every point.

What should you keep once the work is finished?

Keep the point plan, the photos of the routes before closing and the list of labels in the communications cabinet. Also keep the admin passwords, equipment details and operating instructions somewhere everyone in the household knows about. That way any tradesperson who comes in the future can add a point or replace equipment without guessing. For example, if you later want to add a camera in the yard, a photo of the route in the wall shows whether there is an empty conduit you can pull a cable through, without opening walls or unnecessary searching.

Related renovation work

Registered renovation contractors by city

Search for a contractor by name or contractor number

Looking for a contractor for smart home, networking and low voltage?

Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.

Build a project file

We use cookies to improve your experience.