Electrical work in a renovation starts with a plan: where the outlets, switches, lighting points and data points will go, preparation for air conditioners and high-power appliances, and whether the existing panel can carry the extra load. Most of the wiring runs inside the walls and ceilings, so a change after drywall or plaster is closed turns into chiseling and repairs. A common mistake is marking points before you know where the furniture, the bed and the kitchen will be. Settle the furniture plan and the lighting locations first, and only then mark.

Typical range

250-65,000 ₪

by points, panel and scope of prep

The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.

How much does an electrician cost in 2026?

In 2026, an electrician visit costs 250-400 ₪, including VAT. A new electrical point costs 350-600 ₪ without chiseling and 500-800 ₪ with chiseling, and a lighting point 250-450 ₪. Replacing a single-phase panel costs 1,200-2,000 ₪, and a three-phase panel 2,000-3,800 ₪. Rewiring the whole apartment is the big job: 25,000-65,000 ₪. Any work on the panel requires a licensed electrician.

Worked examples

JobRange
Three new outlets in the living room, with chiselingElectrical point with chiseling × 3 points1,500-2,400 ₪
Living room lighting: four points and four fixturesLighting point × 4 points + Light fixture installation × 4 fixtures2,000-3,600 ₪
Replacing a single-phase electrical panelSingle-phase electrical panel1,200-2,000 ₪
Electric car charging stationEV charger installation3,500-6,500 ₪

Where the figures come from: every range here is a line item in the RBM Contractors price list (version 2026.11, including VAT), and every example is a sum of line items times a quantity. The price list was checked against prices published in Israel on 14 November 2026. This is an estimate, not a quote.

What's usually included?

  • Electrical and data points
  • Lighting preparation
  • Panels and protection
  • Coordinating tests
  • Marking and documenting points

What affects the price?

  • Number of points
  • Condition of the existing panel
  • Single-phase or three-phase
  • Chiseling and repairs
  • Coordinating with drywall and lighting

How does RBM help keep it organized?

  • Plan of the points
  • Approval before chiseling
  • Documenting points and infrastructure
  • Checking the finish before handover

Stages of the work

  1. 01

    Checking the current condition

    The electrician checks the panel, the grounding, the cable gauge and the breakers, and marks what's old or unsafe. Together you decide whether to replace the panel, rewire, or add only what's needed.

  2. 02

    A plan of the points for each room

    A plan is prepared for each room with outlets, switches, lighting, data points and preparation for the air conditioner, oven and appliances. The homeowner approves the plan against the furniture plan, including the height of the outlets by the bed, the desk and in the kitchen.

  3. 03

    Marking on the walls

    The plan is transferred to the walls and ceiling with paint or chalk marks, at the exact height and location. Before chiseling, go through each room together and check that every mark is in the right place, because from here on any change costs more.

  4. 04

    Chiseling, conduit and wiring

    Channels are chiseled, conduit and boxes are installed, and cables are pulled in a gauge suited to the load of each circuit. If a wall turns out to be one you can't chisel or there's a beam in the way, the electrician proposes another route and the homeowner approves it.

  5. 05

    Documentation before closing up

    Before plaster, drywall or paint, all the conduit and cable routes are photographed with measurements from a wall or the ceiling. The homeowner receives the photos and confirms that all the points are there according to the plan before the contractor closes up.

  6. 06

    Panel, fittings and testing

    Finally the panel is connected, the outlets, switches and light fixtures are installed, and every circuit and the residual current device are tested. The homeowner gets a panel with clear labels for every breaker, and signs off on the finish only after every point has been checked.

What to check before you pay

  • Check that every breaker in the panel is labeled with the name of the room or appliance it supplies, and that the labels are readable and clear even to someone who wasn't there during the renovation.
  • Press the test button on the residual current device, make sure it cuts the power immediately, and then switch it back on.
  • Go around every outlet in the home with a phone charger and make sure they all work, including the ones behind furniture.
  • Ask to see the photos of the conduit and cables before closing up, and compare the number of points with the plan you approved.
  • Make sure every switch turns on the right light, and that there's no warm outlet, noisy switch or burning smell.

Electrical work price list by line item

10 line items · updated 11/2026

  • Electrician visit

    250-400 ₪

    per visit · During regular working hours, excluding repairs.

  • Electrical point without chiseling

    350-600 ₪

    per point · Surface wiring or a short conduit, depending on site conditions.

  • Electrical point with chiseling

    500-800 ₪

    per point · Includes basic opening and closing of the wall.

  • Lighting point

    250-450 ₪

    per point · Excludes the light fixture.

  • Light fixture installation

    250-450 ₪

    per unit · For a standard fixture, without a new electrical point.

  • Single-phase electrical panel

    1,200-2,000 ₪

    per panel · Basic panel; excludes Israel Electric Corporation requirements.

  • Three-phase electrical panel

    2,000-3,800 ₪

    per panel · Affected by the number of breakers and the condition of the infrastructure.

  • Grounding inspection or replacement

    400-2,500 ₪

    per inspection/repair · Full replacement can cost more depending on the building.

  • EV charger installation

    3,500-6,500 ₪

    per installation · Excludes the charger itself; depends on cable length and access.

  • Apartment rewiring

    25,000-65,000 ₪

    per apartment · By number of points, panel, chiseling and finishes.

Updated November 2026 · price varies by spec and site conditions

See the full price list

Questions about Electrical work

What's important to check in an electrical quote?

Check how many points are included and of what type, because a lighting point, a regular outlet and an air conditioner point are not the same thing. Make sure it states whether the panel is being replaced, who is responsible for repairing the chiseling, and whether the light fixtures and fittings are included or only their installation. A quote that lists a number of points without detail is hard to compare. Ask for a breakdown by room. For example, in one quote an air conditioner point includes a separate line from the panel, and in another only a regular outlet next to the unit, and the gap usually only comes to light when the technician arrives to install it.

Do you need an electrical plan?

In a large renovation it's almost always worth it. An organized plan links the furniture, lighting and appliances to the points themselves, and prevents an outlet behind a closet or a switch in an awkward spot. It's also the basis for comparing quotes and for the final check, because you mark what was done against it. Without a plan, every decision is made on site and under pressure. A simple example: a hallway where you can only turn on the light from the bedroom end, or an outlet next to the bed that's blocked by a nightstand, are mistakes a good plan catches in advance, preventing late chiseling.

Do you need to replace the electrical panel?

Not always, but in older apartments it's common. If you're adding air conditioners, an oven, an electric cooktop or high-power appliances, the electrician needs to check whether the panel and the supply can handle the load. Ask them to explain the condition of the existing panel, and if the connection needs upgrading, consult a licensed professional. Replacing the panel during the renovation is easier than after it. A common sign of a problem is a breaker that trips when you run the air conditioner and the oven, or an old panel with fuses instead of breakers, and it's worth telling the electrician about this when they come to check.

Can you live at home during electrical work?

For spot jobs yes, but rewiring and chiseling throughout the home create a lot of dust and noise, and sometimes part of the home is without power. Agree in advance on when the power will be cut, which rooms keep power and how the refrigerator and computers will be protected. If you work from home, plan an alternative. Working room by room, rather than the whole home at once, makes living there easier. It's especially important to make sure the refrigerator, freezer and any medical equipment stay connected, and to coordinate with the electrician where they'll be plugged in during the shutoff.

What happens if you want to add a point after the walls are closed?

You can, but it means chiseling, repairing the plaster and paint, and sometimes damaging the tiling. So it's worth including spare points in the plan where your needs might change. If you do add one later, ask the contractor for a quote that includes the finishing repairs and not just the point. A spare point that goes unused costs less than late chiseling. For example, an extra outlet in the work corner, a point for an electric shutter or preparation for car charging are things people usually ask for after the walls are already painted.

What should you keep after the electrician is done?

Keep the final plan of the points, the photos of the walls before closing up and the details of the panel and breakers. When you want to hang a shelf or drill into a wall, the photos will show you where the cables run. If a test was done at the end of the work, keep the document you received too. It's also worth keeping the electrician's details in case of a fault. An example from the field: someone drilling to hang a TV without checking the photos can hit a cable running up from the outlet, and then the repair includes chiseling, rewiring and paint.

Related renovation work

Registered renovation contractors by city

Search for a contractor by name or contractor number

Looking for a contractor for electrical work?

Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.

Build a project file

We use cookies to improve your experience.