Kitchen
Who is responsible for what in a kitchen renovation
The kitchen is the room where the most tradespeople work on the same wall: the plumber, the electrician, the tiler, the carpenter, the countertop supplier and sometimes the appliance technician. Each one needs measurements that depend on the others' work, so a point that moves a few centimeters can delay the carpentry or force new chiseling. Quotes are hard to compare, because some include the carpentry and countertop and some don't. Before starting, finalize the carpentry plan, the appliance models and who coordinates between everyone.
35,000-180,000 ₪
per kitchen renovation, including related work
The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.
How much does a kitchen renovation cost in 2026?
In 2026, a basic kitchen renovation costs 25,000-65,000 ₪, including VAT, and a full renovation with moved points and new finishes 55,000-160,000 ₪. Most of the money goes to the cabinets, 3,000-9,500 ₪ per meter, and the countertop, 800-3,500 ₪ per meter. So replacing the cabinets and countertop in a 4-meter kitchen, including removing the old one, comes to around 16,700-56,500 ₪. Electrical and plumbing prep, when needed, adds 5,000-18,000 ₪.
Worked examples
| Job | Range |
|---|---|
| A 4-meter kitchen: new cabinets and countertop in place of the old onesOld kitchen removal + Kitchen cabinets × 4 m + Countertop × 4 m | 16,700-56,500 ₪ |
| Basic kitchen renovation | 25,000-65,000 ₪ |
| Full renovation, including moving pointsFull kitchen renovation | 55,000-160,000 ₪ |
| Backsplash between the cabinetsKitchen wall tiling × 4 m² | 800-2,200 ₪ |
Where the figures come from: every range here is a line item in the RBM Contractors price list (version 2026.11, including VAT), and every example is a sum of line items times a quantity. The price list was checked against prices published in Israel on 14 November 2026. This is an estimate, not a quote.
What's usually included?
- Removing the existing kitchen
- Electrical and plumbing prep
- Wall tiling and walls
- Coordinating the countertop and carpentry
- Finishes and basic cleaning
What affects the price?
- Whether infrastructure is being replaced
- Moving the sink or the cooktop
- Level of carpentry and hardware
- Type of countertop and backsplash
- Coordination between kitchen suppliers and the contractor
How does RBM help keep it organized?
- Pulling together the spec and suppliers
- Coordinating points and plans
- Tracking the preparation stages
- Documenting decisions and changes
Stages of the work
- 01
Carpentry plan and appliances
Before anything is removed, finalize the cabinet plan with the carpenter and choose the appliances: cooktop, oven, dishwasher, refrigerator and range hood. The homeowner approves the final plan, because all the points are derived from it.
- 02
Removing the existing kitchen
Cabinets, countertop and backsplash are removed, water and power are disconnected safely and the debris is taken away. If moisture or old pipes turn up behind the cabinets, take photos and decide together how to deal with it before the preparation work.
- 03
Water and electrical preparation
The plumber and the electrician mark and install points according to the carpentry plan: sink, dishwasher, refrigerator, cooktop, oven, outlets above the countertop and lighting. Before the walls are closed, the homeowner receives photos with measurements and confirms that every point is in place.
- 04
Walls, floor tiling and wall tiling
Walls are repaired, the floor is tiled if needed, and the wall is prepared for the backsplash according to the height of the countertop and the upper cabinets. This is where you decide together whether the backsplash goes in before the carpentry or after the countertop, depending on the type of backsplash.
- 05
Installing the carpentry and countertop
The carpenter installs the cabinets, and then the countertop supplier measures and installs the countertop with cutouts for the sink and cooktop. The homeowner checks the leveling, the cutouts and the gaps for the appliances before the countertop is fixed in place for good.
- 06
Connections and finishing
The sink, faucet, dishwasher and cooktop are connected, the range hood and lighting are installed, and the silicone and finishing touch-ups are completed. At the end, every appliance and every faucet is run together with the homeowner, and only then does the homeowner approve the handover.
What to check before you pay
- Ask to see the water and electrical points marked on the wall against the carpentry plan before any chiseling starts.
- Open and close every door and every drawer, and check that they are straight, close all the way and don't touch each other.
- Put a level on the countertop and check that it is straight, and that the joints between countertop pieces are barely visible.
- Run the dishwasher and the sink water together, and look under the sink with a flashlight to make sure the connections aren't dripping.
- Make sure every appliance has an outlet in the right place, and that the range hood is connected and draws air properly when you turn it on.
Kitchen price list by line item
8 line items · updated 11/2026
Old kitchen removal
1,500-4,500 ₪
per kitchen · Includes removing cabinets, a basic countertop and regular debris removal.
Electrical and plumbing prep
5,000-18,000 ₪
per kitchen · Water, drain, electrical and lighting points according to the design.
Kitchen wall tiling
200-550 ₪
per m² · Ceramic, porcelain or other cladding, per spec.
Countertop
800-3,500 ₪
per meter · Caesarstone, granite, Corian or specialty materials.
Kitchen cabinets
3,000-9,500 ₪
per meter · Carpentry by material, hardware and fronts.
Basic kitchen renovation
25,000-65,000 ₪
per kitchen · Cabinets, wall tiling and basic infrastructure repairs.
Full kitchen renovation
55,000-160,000 ₪
per kitchen · Includes infrastructure, carpentry, countertop and finishes.
Luxury kitchen renovation
140,000-400,000 ₪
per kitchen · High-end finishes, carpentry and systems.
Updated November 2026 · price varies by spec and site conditions
See the full price listQuestions about Kitchen
Does the price of a kitchen renovation include the carpentry?
Not necessarily. In some quotes the contractor prices only removal, preparation and finishing, and the cabinets, countertop and appliances come from separate suppliers. When comparing quotes, break each one down into its components and check what it includes, otherwise a low price may simply leave out the biggest part of the kitchen. Ask each contractor for a list of what he doesn't include. For example, a quote that covers only preparation and tiling can't be compared with one that also covers cabinets and a countertop, even if they have the same title and the amounts look close.
What should be finalized before work starts in the kitchen?
The final carpentry plan, the appliance models and their dimensions, the location of the sink and cooktop, and the type of backsplash and countertop. Also agree on who coordinates between the contractor, the carpenter and the countertop supplier, and who pays for the fix when the tradespeople's measurements don't match each other. This coordination should be in writing, not just verbal. A common example: the carpenter builds an oven cabinet to the measurements of a model that was later replaced, the new oven doesn't fit, and then the argument starts over who is at fault and who pays for the change.
Can the sink or the cooktop be moved somewhere else?
Usually yes, but it changes the scope of work. Moving a sink requires a drain sloping down to the existing line, and sometimes raising the floor or passing through a wall. Moving the cooktop involves the electrical work and the range hood, so ask the contractor to check the route on site before you approve the carpentry plan. Changing a location after ordering from the carpenter sometimes means redesigning the cabinets. For example, a sink that moves to an island in the middle of the kitchen needs a drain running under the floor, which is a completely different job from a small shift along the same wall, so the price is different too.
How do you manage at home without a kitchen?
Set up a temporary corner in another room with a refrigerator, a hot water urn and a small counter, and agree with the contractor when the water and power in the kitchen will be off. Ask in advance which stages have waiting time between them, for example between installing the cabinets and measuring for the countertop, so you know how long the kitchen won't be usable. Keep dishes and food in closed boxes, away from the dust. If there are small children at home, agree with the contractor where tools and materials are kept when the crew isn't on site, and how access to the kitchen is closed off.
Which kitchen products should we buy ourselves?
Usually the homeowner buys the appliances, the sink and the faucet, and sometimes the backsplash tiles too, while the contractor brings the working materials. It's important to give the contractor and the carpenter the dimensions and installation instructions for each product before the preparation work, because a dishwasher or oven of a different size means changes to the cabinets. Buying too early can leave large appliances in the way of the work. Ask the supplier for the installation instructions at the time of purchase, because they list the ventilation gaps and the required location of the outlet and water connection, and whether a special cabinet is needed.
What should you keep once the kitchen is done?
Keep the carpentry plan, the photos of the walls before they were closed, and the details of the countertop, hardware and appliances. Ask the countertop supplier how to clean the surface and what might stain it, and check the silicone around the sink and the connections underneath from time to time. If spare backsplash tiles or handles are left over, keep them. A simple example: a light-colored countertop can be stained by coffee, wine or lemon left on it, so it's worth knowing in advance which cleaning products suit it and which damage it.
Related renovation work
Doors and windows
1,500-40,000 ₪
by item and size02Carpentry and interiors
3,500-70,000 ₪
by item and custom carpentry03Air conditioning
1,500-85,000 ₪
by installation and system04Light construction and blockwork
300-8,500 ₪
per m² or by scope05Outdoor work and landscaping
180-120,000 ₪
per m² or per project06Post-renovation cleaning and polishing
800-6,000 ₪
by apartment and amount of messRegistered renovation contractors by city
- Jerusalem992
- Tel Aviv-Yafo487
- Rishon LeZion410
- אום אל-פחם343
- Petah Tikva315
- Be'er Sheva294
- Nazareth282
- Netanya253
- Haifa252
- Ashkelon244
- Holon244
- Ramat Gan214
- Ashdod208
- Herzliya182
- Hadera171
- Rehovot164
- Kfar Saba161
- טייבה157
- עילוט149
- מעלה עירון136
- Hod HaSharon125
- Ra'anana124
- Bnei Brak117
- מג'דל שמס107

Looking for a contractor for kitchen?
Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.