Air conditioning
Air conditioning preparation is closed in before the ceiling
Air conditioning work in a renovation is split into preparation done while the walls and ceilings are still open, and installing the units at the end. The common mistakes are drainage without enough slope, copper piping closed into drywall without testing, and a condenser placed where there's no access for servicing. Before ordering the preparation work, decide on the type of system, the location of each indoor and outdoor unit and the route of the ducts. That way the electrician and the drywall installer work to one shared plan.
1,500-85,000 ₪
by installation and system
The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.
What's usually included?
- Preparation and points
- Ducts and drainage
- Wiring and power supply
- Installing units
- Testing and commissioning
What affects the price?
- Type of system
- Number of units and points
- Complexity of ducts and drainage
- Coordination with drywall and ceilings
- Access and unit locations
How does RBM help keep it organized?
- Plan of points and preparation
- Coordination with drywall and electrical
- Documenting duct routes
- Test run before handover
Stages of the work
- 01
Choosing the system and locations
The air conditioning technician checks the apartment, proposes wall-mounted units or a mini-central system, and marks a location for each indoor and outdoor unit. The homeowner decides on the type of system and the locations, and checks that the condenser doesn't end up on a balcony that's in use or facing a neighbor's window.
- 02
Plan of preparation and routes
The routes of the copper piping, drainage, power supply and ducts to each room are drawn up. At this stage, heights, passages near beams and the location of the service hatch are coordinated with the electrician and the drywall installer, and the homeowner approves the plan before the work is carried out.
- 03
Preparation in the walls and ceiling
Piping, sloped drainage and cables are laid, and the copper is insulated along its full length. The contractor and the technician agree on who is responsible for each section, and the homeowner receives photos of the routes before they disappear behind the drywall.
- 04
Pressure and drainage test before closing
Before the drywall is closed, the technician pressure-tests the copper piping and pours water into the drain to see that it flows out. Only after the test passes and is documented is the drywall installer given the go-ahead to close the ceiling.
- 05
Installing units and grilles
Toward the end of the finishing work, after painting and dust, the units are hung, connected to the prepared piping, and the grilles and service hatches are installed. The homeowner makes sure the air conditioners themselves were ordered on time, and decides whether the installation is done by the same technician who did the preparation.
- 06
Commissioning and handover
Each unit is run in cooling and heating mode, the airflow in each room is checked, and you make sure the indoor unit isn't dripping. The homeowner gets an explanation of the remote control and cleaning the filters, and approves the handover only after every room has been checked.
What to check before you pay
- Ask to see photos of the copper piping and drainage with the insulation, before the ceiling or wall is closed.
- Make sure the pressure test and pouring water into the drain were done with someone on your behalf present, or were photographed and sent to you.
- Check that there's a convenient service hatch for the mini-central unit, and that the condenser can be reached without climbing over a railing.
- Turn on each air conditioner yourself, and make sure air comes out of every grille and actually reaches the room it's supposed to serve.
- Make sure the drain pipe ends at the agreed point and doesn't drip onto the exterior wall, a balcony or the neighbors.
Air conditioning price list by line item
6 line items · updated 11/2026
Small wall-mounted AC installation
900-1,800 ₪
per unit · Labor only; the AC unit is separate.
Medium wall-mounted AC installation
1,300-2,400 ₪
per unit · By pipe length, access and drainage.
Drain point and piping prep
500-1,800 ₪
per point · During a renovation, before closing walls or drywall.
Mini-central AC installation
25,000-85,000 ₪
per apartment · Includes the system, ducts and grilles, per spec.
Removing an existing AC
400-900 ₪
per unit · Depends on access and height.
Deep AC cleaning
250-600 ₪
per unit · Cleaning and disinfection after or before a renovation.
Updated November 2026 · price varies by spec and site conditions
See the full price listQuestions about Air conditioning
When is air conditioning preparation done in a renovation?
The preparation is done after demolition, alongside the electrical infrastructure, and before the drywall, ceilings and plaster are closed. So the decision on the type of system and the unit locations needs to be made at the planning stage. If you wait until the end of the renovation, you usually end up with exposed ducts or with reopening finished walls. Ask the technician to mark the routes on the wall before the electrician starts. What most often goes wrong: the drywall installer closes a dropped ceiling before the technician arrives, and then the drain route runs without a slope or the air conditioner is hung somewhere other than planned.
Is the installation included in the renovation work?
Not always. Sometimes the renovation contractor does only the preparation, and the air conditioners themselves are installed by a separate air conditioning technician or the system supplier. Ask for the quote to state clearly what's included: piping, drainage, electrical work, ducts, grilles, installation and commissioning, and who is responsible if something doesn't work at the end. Compare quotes only after each one lists the same components. A common example: the quote includes installation, but not the electrical connection to the outdoor unit or the bracket it stands on, and these turn out to be extras only during installation.
What is the difference between wall-mounted units and a mini-central system as far as the renovation goes?
A wall-mounted unit mainly needs a piping, drainage and electrical point next to each unit, and it can be added at a relatively late stage. A mini-central system needs a dropped ceiling, ducts to each room and a service hatch, so it affects the ceiling height and the drywall work. Settle this decision before planning the ceilings. Also ask how much space is needed above the dropped ceiling and where the unit will sit, because in apartments with low ceilings this can affect how the room feels. Ask to see a cross-section of the ceiling before deciding.
What should we buy ourselves and what should we leave to the technician?
Many people buy the air conditioners themselves and leave the preparation and installation to the technician. In that case, check before buying that the model suits the size of the room and the planned location, and coordinate a delivery date that won't hold up the finishing work. Piping materials, insulation and cables are usually best supplied by the technician, so that responsibility for the work stays with one main party. A common problem: the model you bought comes with pipe connections of a different diameter or with the drain on the opposite side, and the technician has to change preparation work that was already closed in. Send the model details before you buy.
What do you do if you discover during the renovation that there's no room for the condenser or the duct?
Sometimes a beam, a pipe or a shared shaft doesn't allow the planned route. In that case, stop, ask the technician for a written alternative showing its effect on the drywall, the electrical work and the price, and decide before going on. If the alternative involves a beam or an exterior wall, consult an engineer first. For example: a beam that didn't appear on the plan blocks the duct to the bedroom, and the alternatives are to lower the ceiling in the hallway, run the duct through a closet, or add a wall-mounted unit in the room.
How do you maintain the air conditioning after the renovation?
After a renovation the filters are full of construction dust, so clean them right at the end and order a deep cleaning of the unit if it ran during the work. Keep the route plan and the photos from before the walls and ceilings were closed, so a future technician knows where the piping runs. Check from time to time that the drain isn't blocked. A problem that comes up a lot: a drain blocked by dust or algae causes the indoor unit to drip down the wall, and the damage is discovered only when the paint starts peeling. If you see a wet stain under the air conditioner, turn it off and have the drain checked.
Related renovation work
Light construction and blockwork
300-8,500 ₪
per m² or by scope02Outdoor work and landscaping
180-120,000 ₪
per m² or per project03Post-renovation cleaning and polishing
800-6,000 ₪
by apartment and amount of mess04Planning, measurements and prep
1,500-45,000 ₪
by scope of planning and prep05Logistics and site protection
1,000-28,000 ₪
by access and project scope06Glass, shower enclosures and mirrors
600-28,000 ₪
by item and sizeRegistered renovation contractors by city
- Jerusalem992
- Tel Aviv-Yafo487
- Rishon LeZion410
- אום אל-פחם343
- Petah Tikva315
- Be'er Sheva294
- Nazareth282
- Netanya253
- Haifa252
- Ashkelon244
- Holon244
- Ramat Gan214
- Ashdod208
- Herzliya182
- Hadera171
- Rehovot164
- Kfar Saba161
- טייבה157
- עילוט149
- מעלה עירון136
- Hod HaSharon125
- Ra'anana124
- Bnei Brak117
- מג'דל שמס107

Looking for a contractor for air conditioning?
Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.
Build a project file