Skip to content

Light construction and blockwork

Light construction and block walls, after a structural check

Light construction and block work covers block walls, cement board partitions, closing up niches and openings, local concrete repairs, and small platforms or steps. The main risk is damaging a load-bearing wall, a beam, or utilities running inside the wall, or building a wall that doesn't sit where it was marked on the plan. So first you check what the existing wall does in the structure and, if needed, consult an engineer. Then the new wall is marked on the floor and you decide what runs inside it.

Typical range

300-8,500 ₪

per m² or by scope

The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.

What's usually included?

  • Marking and planning
  • Building walls and partitions
  • Prep for utilities
  • Plaster and prep for finishing
  • Debris removal and cleanup

What affects the price?

  • Block type and construction
  • Area and scope
  • Utilities running through the wall
  • Structural check
  • Access and logistics

How does RBM help keep it organized?

  • Structural check and approvals
  • Coordinating wall and utility locations
  • Documenting construction stages
  • Finish check before plastering

Stages of the work

  1. 01

    Checking the existing structure

    Before any chiseling or building, check what is holding up the ceiling, where beams and columns run, and what is already hidden in the walls. If there is any doubt about a load-bearing wall, the homeowner orders an engineer's opinion and decides based on it whether to go ahead.

  2. 02

    Marking on the floor

    The contractor marks the lines of the walls, openings and doors on the floor and ceiling according to the plan. The homeowner walks through the marking in the room itself, checks passage widths and door locations, and approves before construction starts.

  3. 03

    Choosing the material and wall type

    You decide whether the wall will be block, cement board or drywall, based on weight, sound insulation, humidity in the room and what needs to hang on it. The homeowner approves the wall type in writing, including its thickness and what runs inside it.

  4. 04

    Building and prep for utilities

    The wall is built course by course, anchored to the existing walls and ceiling, with passages left for electrical and water lines. At this stage the electrician and plumber mark their points, and the homeowner approves the locations before the other side is closed.

  5. 05

    Lintels, openings and concrete repairs

    A lintel or suitable reinforcement is placed above openings, and wherever rusty rebar is exposed, the concrete is repaired with a dedicated product. The homeowner gets photos of the reinforcements and repairs before they are covered with plaster.

  6. 06

    Plaster and a check before finishing

    The wall is plastered or prepped for finishing, and level, plumb and corners are checked before paint or tiling. Walk the wall together with the contractor under side lighting, and agree in writing on what gets fixed before paying for the stage.

What to check before you pay

  • Hold a long level against the new wall in several places, and check there are no bumps or dips that will show after painting.
  • Make sure the wall stands exactly on the line that was marked and approved, and that the widths of doors, passages and niches match the signed plan.
  • Ask to see photos of the anchoring to the existing walls and of the lintels above openings before they are covered.
  • Check that there is no open crack where the new wall meets the old wall and the ceiling, and that the corners are straight and clean all the way up.
  • Make sure every electrical and water point planned in the wall is in place before the contractor closes out the stage.

Light construction and blockwork price list by line item

6 line items · updated 11/2026

  • Building a block wall

    450-750 ₪

    per m² · Includes basic plaster and prep for painting as needed.

  • Cement board partition

    300-750 ₪

    per m² · A lighter, faster solution in some projects.

  • Light balcony enclosure

    3,500-8,500 ₪

    per m² · Depends on the permit, frame, insulation and finish.

  • Local concrete repair

    450-1,500 ₪

    per area · Includes chiseling, repair and suitable material.

  • Steps or a small platform

    2,000-12,000 ₪

    per project · By frame, cladding and finish.

  • Opening or closing a niche

    1,200-5,000 ₪

    per project · Depends on the wall, infrastructure and finish.

Updated November 2026 · price varies by spec and site conditions

See the full price list

Questions about Light construction and blockwork

Do I need approval to add a wall?

It depends on the type of wall, the building and what changes in the apartment, and there is no single answer for every case. A light partition inside the apartment is very different from a wall that touches beams, the facade or a shared area. Before you start, make sure there is no effect on the structure, and if in doubt, consult an engineer or a licensed professional. Example: a drywall partition that splits a living room to create an extra room is different from opening a gap in a concrete wall between the kitchen and the living room. For an opening like that, ask for a written opinion before hiring a contractor, and keep it with the apartment's documents.

What affects the price of light construction?

The type of material, the wall's area and height, the number of openings and lintels, what runs inside the wall and the level of finish required. Access and removal matter too: carrying blocks up to a high floor without an elevator is different from working on the ground floor. To compare quotes, ask that each one list the same materials and the same level of finish. Also ask who removes the debris and whether plaster is included. Example: a quote for a light partition that doesn't include reinforcement for a wall-hung cabinet looks cheap, until it turns out the wall has to be opened again to add it.

Which is better, a block wall or a cement board partition?

A block wall is heavier and more stable, holds weight and blocks noise better, but it needs plaster and drying time. A light partition is faster, cleaner and makes running utilities easier, but reinforcement for shelves, cabinets and wall-hung fixtures has to be planned in advance. The choice depends on what the wall needs to carry and on the ceiling it sits under. Example: a wall between bedrooms is best built to block noise, and with a light partition that means asking for insulation inside it rather than leaving it hollow. In a wet room, ask which boards are suitable for humidity and how they are waterproofed.

What happens if rusty rebar or pipes are found in the wall while chiseling?

Work stops in that area and whatever was found is photographed. The contractor proposes a solution and its effect on the price in writing, and if rebar is exposed in a beam or column, it is worth consulting an engineer before the repair. Pipes or cables that turn up are handed to the right tradesperson, not covered over without a check. A common example: while opening a niche, an old drain pipe running through that spot is exposed, and then you have to decide whether to move it, change the niche's dimensions or give it up. Write down the decision and its effect on the price before work continues.

Can I live at home while walls are being built?

Yes, but be ready for dust, chiseling noise and heavy materials being carried through the home. It helps to seal off the work area with plastic sheeting, protect the flooring along the carrying route and coordinate noisy work hours with the neighbors. If there are small children at home or anyone with breathing problems, it is better to stay away during the chiseling stages. Ask in advance which stages are the noisiest and dustiest, such as chiseling concrete or cutting blocks, and ask that they be done in one stretch rather than spread across the whole job. That makes it easier to plan when not to be home.

What should I keep after the wall is built?

Keep photos of the wall before plastering, showing where the pipes, cables and lintels are, along with the plan with the final dimensions. That way you will know in the future where it is safe to drill and where a pipe runs. If you consulted an engineer, keep their opinion with the renovation documents too. Photos like these save searching later and prevent hitting a pipe when you hang a cabinet or shelf. Ask the contractor to also mark on the plan where reinforcement for hanging was added, because in a light wall that is the difference between a cabinet that holds and a wall that cracks.

Related renovation work

Registered renovation contractors by city

Search for a contractor by name or contractor number

Looking for a contractor for light construction and blockwork?

Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.

Build a project file

We use cookies to improve your experience.