Office and commercial renovation
Renovating offices and businesses without stopping operations
Renovating an office, shop or restaurant differs from renovating an apartment mainly because of the activity that continues around it: employees, customers, suppliers and building management. The work usually includes re-dividing the space with drywall partitions, an acoustic ceiling, lighting, electrical and communication points, and finishes that stand up to heavy use. What usually causes disruption is communications infrastructure that was not planned in advance, noisy work during business hours and a lack of coordination with building management on elevators, parking and debris removal. Before the quote, settle a workstation plan, the permitted working hours and who in the business is authorized to approve changes.
900-6,000 ₪
per m², by type of business
The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.
What's usually included?
- Planning the space layout
- Electrical and communications infrastructure
- Drywall, flooring and paint
- Lighting and systems
- Finishes and handover
What affects the price?
- Area and layout
- Communications and electrical infrastructure
- Working during operations
- Schedules
- Commercial finish level
How does RBM help keep it organized?
- Gathering requirements and a plan
- Coordinating phases around operations
- Tracking infrastructure and finishes
- Documenting decisions and changes
Stages of the work
- 01
Gathering requirements
You sit down with whoever runs the business and define how many workstations, meeting rooms, a kitchenette and a server room are needed, and what must keep working during the renovation. At this stage one contact person from the business is appointed to approve decisions with the contractor.
- 02
Plan and coordination with the building
A layout plan and a plan of electrical and communication points are prepared, and presented to building management together with the working hours and how materials will be brought in. Here the plan is approved, along with the building's rules for noise, elevators and removal.
- 03
Dividing into zones and phases
The work is divided into zones, so some employees keep working on one side while the other side is renovated, with a dust partition separating them. The business owner approves the order of the zones and the noisy work that will be done outside business hours.
- 04
Infrastructure before closing
Electrical, communications and air conditioning are run before the partitions and ceiling are closed, and each point is marked according to the plan. Before closing, you go over the point locations and the route to the communications cabinet with whoever is responsible for IT in the business.
- 05
Finishes and lighting
The ceiling, flooring or carpet, paint, lighting and doors are installed, with materials chosen to stand up to employee and customer traffic. Here you approve finish samples and the lighting level at the workstations before the final order.
- 06
Handover and return to operations
Before the employees return, every electrical and communication point is tested, a thorough cleaning is done and any damage to the building's shared areas is repaired. The final stage is paid after the defect list has been closed and up-to-date as-built plans have been received.
What to check before you pay
- Test every communication point with a computer or network tester, and make sure each one is labeled and leads to the right place in the cabinet.
- Make sure you received an updated plan of the electrical and communication routes as they were actually installed, not just the original plan.
- Ask building management to confirm that the lobby, elevators and corridors were handed back clean and undamaged, before the final payment.
- Check the sound insulation in the meeting rooms: talk in a normal voice in the room and make sure you cannot be heard clearly from outside.
- Go over each workstation with the person who sits there, checking outlets, lighting and air conditioning, and write every comment on the defect list.
Office and commercial renovation price list by line item
8 line items · updated 11/2026
Standard office renovation
1,200-2,900 ₪
per m² · Layout, infrastructure, ceilings, lighting and finishes to a standard commercial level.
Store renovation
900-2,500 ₪
per m² · Depends on current condition, storefront, lighting and brand requirements.
Restaurant or commercial kitchen renovation
2,500-6,000 ₪
per m² · Heavy infrastructure, ventilation, stainless steel and licensing requirements raise the cost significantly.
Acoustic drywall partitions for offices
300-750 ₪
per m² · Includes acoustic insulation; interior glazing is separate.
Acoustic / mineral ceiling
120-260 ₪
per m² · Includes framing and standard ceiling tiles.
IT / network infrastructure point
250-600 ₪
per point · By distance from the network cabinet and cable type.
Office room painting
800-1,800 ₪
per room · Evening or weekend work may cost more.
Night / weekend work surcharge
15%-35%
of the work · When the business can't close during opening hours.
Updated November 2026 · price varies by spec and site conditions
See the full price listQuestions about Office and commercial renovation
How do you renovate an office without stopping operations?
The office is divided into zones that are renovated one after another, while employees move temporarily to a zone that is already finished or work from home. Noisy, dusty work such as demolition and drilling is scheduled for hours when the office is closed, and dust partitions separate the zones. It is important to agree on this arrangement in advance, because work at special hours affects the price. A practical example is finishing the meeting room first, so employees can move into it while the open space is being renovated, and that way work never stops at all.
What is important to coordinate in a commercial renovation?
Beyond electrical and communications infrastructure, you need to coordinate working hours, use of the elevators, parking for suppliers and debris removal with building management. Inside the business, you coordinate who approves decisions, when equipment and computers are moved and how customers are informed about changes. On the finish level, decide in advance where to invest, for example in the entrance and the meeting rooms. Something that often goes wrong is moving drywall boards in a passenger elevator at peak hours, so get written rules from building management before the materials arrive, including the permitted hours for deliveries.
How is renovating a restaurant or commercial kitchen different from renovating an office?
Mainly in the infrastructure: drainage and grease traps, ventilation and extractor hoods, power for heavy equipment and stainless steel surfaces that are easy to clean. So bring in a kitchen designer or consultant early, so the plan suits the equipment and the way you work before anything starts. Any change after installation costs much more. Also plan the equipment locations in advance and get its dimensions from the supplier, because they determine where drainage, power and ventilation run and where a reinforced floor or wall is needed for heavy equipment.
Who approves changes in the middle of the work?
Decide in advance on one contact person from the business who is authorized to approve changes, and agree that every change is recorded with its price and its effect on the schedule before it is carried out. When several managers give the contractor instructions at the same time, you get conflicting changes and extras that nobody approved. Proper documentation prevents arguments at the end. For example, a request to add outlets at a workstation that has already been closed in drywall looks small, but it requires opening up, wiring and a paint repair, so record it before it is carried out, together with the price and the effect on the handover.
What do you do with furniture, computers and equipment during the renovation?
Sensitive equipment such as computers, servers and printers should be moved out of the area or covered well, because drywall dust gets everywhere. Agree who is responsible for taking apart and reassembling the furniture, who disconnects and reconnects the network and where everything is stored. A list of equipment with photos before the move helps if something gets damaged. Back up the data on the computers and servers before the move, and coordinate in advance with whoever is responsible for IT when the network is disconnected and when it is reconnected, so the business is not left without a network.
How do you compare quotes for an office renovation?
Ask for all the quotes to be based on the same plan and the same specification: number of partitions, type of ceiling, number of electrical and communication points and finish level. Check whether the quote includes work outside business hours, debris removal, protection of shared areas and cleaning before the return. A quote that looks cheap sometimes assumes work during regular hours only. Also ask to see an office the contractor renovated while it was operating, and ask the business there how order, cleanliness and the promised schedule were kept, and what happened when surprises came up.
Related renovation work
Shared buildings and stairwells
1,500-80,000 ₪
by scope and number of floors02Labor rates and tradespeople
150-2,200 ₪
per hour or workday03Bathroom renovation
18,000-65,000 ₪
per standard bathroom04Apartment renovation
90,000-420,000 ₪
per apartment, partial to extensive renovation05Private house renovation
1,500-6,500 ₪
per m², by scope and finish level06Demolition and removal
1,500-35,000 ₪
by scope of demolition and removalRegistered renovation contractors by city
- Jerusalem992
- Tel Aviv-Yafo487
- Rishon LeZion410
- אום אל-פחם343
- Petah Tikva315
- Be'er Sheva294
- Nazareth282
- Netanya253
- Haifa252
- Ashkelon244
- Holon244
- Ramat Gan214
- Ashdod208
- Herzliya182
- Hadera171
- Rehovot164
- Kfar Saba161
- טייבה157
- עילוט149
- מעלה עירון136
- Hod HaSharon125
- Ra'anana124
- Bnei Brak117
- מג'דל שמס107

Looking for a contractor for office and commercial renovation?
Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.
Build a project file