Private house renovation
Renovating a private house, floor by floor
Renovating a private house usually includes things an apartment doesn't have: a roof, facades, a yard, rainwater drainage and utilities the house maintains on its own, from the sewer connection to the electrical panel. Problems start when work begins inside before the building envelope is checked, and then moisture from the roof or the exterior walls damages the new finishes. Before getting quotes, set priorities between outside and inside and divide the house into areas. That way every contractor prices the same areas, and the schedule is built by stages rather than from a general estimate.
1,500-6,500 ₪
per m², by scope and finish level
The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.
What's usually included?
- Demolition and preparation
- Utilities and systems
- Flooring, drywall and paint
- Exterior, roof and landscaping
- Coordinating finishes and handover
What affects the price?
- Area and number of floors
- Condition of the existing utilities
- Exterior and garden work
- Level of finishing materials
- Site access and logistics
How does RBM help keep it organized?
- Gathering requirements and plans
- Breaking down the work by area
- Splitting into stages and payments
- Updates and documentation throughout the work
Stages of the work
- 01
Checking the envelope and utilities
Before any planning, check the roof, the facades, the drainage around the house, the main pipes and the electrical panel. If there are cracks or structural changes, consult an engineer, and the homeowner decides which findings are dealt with first.
- 02
A plan by area and floor
Divide the work into areas: each floor, the roof, the facades and the yard, each with its own specification. The homeowner approves the order of work and the payments tied to each area, so it's possible to stop after a stage without undoing everything.
- 03
Roof, waterproofing and facades
Envelope work is done before the interior finishes, because it prevents moisture that would ruin them. At this stage, agree on who orders the scaffolding, how the yard and plants are protected, and how the waterproofing is tested before moving inside.
- 04
Utilities on every floor
Pipes, drainage and electrical wiring are replaced or rerouted on each floor, and the passages between floors are coordinated. Before the walls are closed, the homeowner approves the location of the points, the pipe route between floors and the location of the water heater and the panel.
- 05
Finishes floor by floor
Floor tiling, drywall, plaster and paint move from floor to floor, so part of the house is freed up sooner. On each finished floor there's a short walkthrough, the floor is approved in writing and protected from the work still going on in the rest of the house.
- 06
Exterior, yard and handover
At the end, the landscaping in the yard, the drainage and the outdoor lighting are finished, and the debris is cleared from the site. The handover includes a walkthrough of every floor and the outside, a check of the systems and a snag list that is closed out before the final payment.
What to check before you pay
- Ask to see the roof and the gutters after the waterproofing work, and check that the water flows to the drains and doesn't collect on the roof.
- Check that the slope of the paving in the yard and on the balconies carries water away from the walls of the house and not toward the doors.
- Make sure every breaker in the electrical panel is labeled by floor and room, and that you know where the main water valve is.
- Ask for photos of the pipe routes between floors and of the sewer connection before they are covered under the floor tiles.
- After heavy rain, or after hosing down the walls, check that there are no damp stains on the exterior walls or on the top floor's ceiling.
Private house renovation price list by line item
6 line items · updated 11/2026
Cosmetic house renovation
1,500-2,800 ₪
per m² · Painting, repairs and finishes without fully replacing infrastructure.
Full house renovation
2,800-6,500 ₪
per m² · Infrastructure, finishes, wet rooms and coordinating indoor and outdoor work.
Facade renewal and exterior plaster
160-450 ₪
per m² · Depends on scaffolding, current condition and type of finish.
Yard renovation and landscaping
180-650 ₪
per m² · Paving, drainage, basic landscaping and lighting; details in the outdoor work category.
House extension / addition
6,000-12,000 ₪
per built m² · Initial range for light/conventional construction; permit, consultants and fees are separate.
Adding a safe room (mamad)
150,000-300,000 ₪
per project · Initial range only; depends on the permit, foundations, access and required protection. Design and fees are separate.
Updated November 2026 · price varies by spec and site conditions
See the full price listQuestions about Private house renovation
How long does renovating a private house take?
The answer depends on the area, the number of floors, the scope of the utilities work and the exterior work, so any general number is misleading. Ask the contractor for a schedule by stages and areas, with points where you approve what has been completed. That way you see early if a certain stage is dragging and affecting everything else. Also ask to know in advance which stages depend on the weather. For example, roof waterproofing and exterior painting are usually done in dry weather, so plan them ahead rather than leaving them for the end.
What should be coordinated in advance in a private house?
The order of work between outside and inside, the utilities the house maintains on its own such as sewage, drainage and the water heater, and access to the site: where the skip stands, where materials are stored and how equipment gets into the yard. Also agree in advance who coordinates between the tradespeople when several of them work at the same time. For example, if there's no room for a skip on the lot, check in advance where it can be placed on the street and who takes care of that. Access for a concrete truck or a crane to the yard also affects the order of work.
Can you live in the house during the renovation?
In a house with several floors it's more feasible than in an apartment, if you leave a floor or wing usable and separate it from the work. Agree in advance on the workers' route through the house, when water and power will be shut off for the whole house, and how a temporary bathroom and kitchen will be kept available. Keep children and pets away from the yard during work at height and with machinery. For example, when the main water pipe is replaced, the water is shut off for the whole house, so it's good to know about it in advance and get ready with water for drinking and for the toilets.
What comes first, the roof or the interior renovation?
In most cases the envelope comes first: roof, waterproofing, windows and facades. New interior finishes aren't worth much if water gets in from above or through the walls after the winter. If the budget is limited, it's better to finish the envelope and postpone some of the finishes, not the other way around. That way the money invested inside is protected. For example, a wood floor or a new drywall ceiling on the top floor will be damaged quickly if the roof keeps leaking. Ask the contractor to check the roof and the windows before ordering expensive interior finishes.
What do you do when a problem with the sewage or the foundations turns up?
Stop work in that area, take photos and ask the contractor for a written explanation of the problem and the proposed solution. When it involves cracks, settling or anything related to the structure, consult an engineer before deciding. The extra work goes into the plan only after written approval with a price. Keep the engineer's opinion together with the rest of the house documents. For example, a broken sewer pipe under the yard can explain moisture in a wall that looked like a waterproofing problem, and repairing the wall alone won't help.
How do you take care of the house after the renovation?
Keep a plan of the pipe, electrical and drainage routes, and the details of the materials used on the roof and facades. Before each winter, clean the gutters and drains and check the roof, and after heavy rain go over the ceilings and exterior walls. A problem caught early stays small. For example, a gutter clogged with leaves can flood the roof and cause moisture in the ceiling even after new waterproofing. Also check from time to time that the drain openings in the yard are clear and that water isn't pooling next to the walls. Shrubs touching a wall also keep it damp.
Related renovation work
Apartment renovation
90,000-420,000 ₪
per apartment, partial to extensive renovation02Demolition and removal
1,500-35,000 ₪
by scope of demolition and removal03Painting
1,800-12,000 ₪
by number of rooms and amount of repairs04Plaster and skim coat
75-650 ₪
per m², by finish type05Drywall
280-650 ₪
per m², typical work06Flooring
180-620 ₪
per m², excluding expensive tilesRegistered renovation contractors by city
- Jerusalem992
- Tel Aviv-Yafo487
- Rishon LeZion410
- אום אל-פחם343
- Petah Tikva315
- Be'er Sheva294
- Nazareth282
- Netanya253
- Haifa252
- Ashkelon244
- Holon244
- Ramat Gan214
- Ashdod208
- Herzliya182
- Hadera171
- Rehovot164
- Kfar Saba161
- טייבה157
- עילוט149
- מעלה עירון136
- Hod HaSharon125
- Ra'anana124
- Bnei Brak117
- מג'דל שמס107

Looking for a contractor for private house renovation?
Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.
Build a project file