Flooring
In flooring, the substrate determines the result
Flooring looks like a job about tiles, but most of the important decisions are underneath them: whether to remove the existing floor or tile over it, what condition the substrate is in, and how the new height works with doors, thresholds and the shower. When the substrate isn't stable or level, even an expensive tile will crack, shift or sound hollow when tapped. Common mistakes are uneven grout lines, the wrong slope in wet areas and tiles ordered without extra stock for waste. So it's worth settling first on the method, the final floor height and the quantity of tiles including a reserve.

180-620 ₪
per m², excluding expensive tiles
The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.
How much does flooring cost in 2026?
In 2026, new flooring on a sand bed costs 400-550 ₪ per m², including VAT, and tiling over the existing floor 190-300 ₪ per m². Removing the old floor and hauling it away adds 60-130 ₪ per m². So replacing all the flooring in a 4-room apartment, about 90 m², comes to around 41,400-61,200 ₪ for the labor. The tiles themselves aren't included, and large tiles raise the installation to 250-450 ₪ per m².
Worked examples
| Job | Range |
|---|---|
| Replacing the flooring in a 4-room apartment, including removalFloor removal and debris removal × 90 m² + New flooring on a sand bed × 90 m² | 41,400-61,200 ₪ |
| Tiling over the existing floor, same apartmentTiling over an existing floor × 90 m² | 17,100-27,000 ₪ |
| A 12 m² balconyOutdoor and balcony flooring × 12 m² | 2,640-6,240 ₪ |
| Baseboards for the whole apartmentBaseboards × 60 m | 2,100-5,400 ₪ |
Where the figures come from: every range here is a line item in the RBM Contractors price list (version 2026.11, including VAT), and every example is a sum of line items times a quantity. The price list was checked against prices published in Israel on 14 November 2026. This is an estimate, not a quote.
What's usually included?
- Removal or tiling over
- Preparing the substrate
- Tiling and grout lines
- Skirting and finishes
- Debris removal as agreed
What affects the price?
- Tiling over versus removal
- Tile size and type
- Leveling the substrate
- Work area
- Floor level and access for removal
How does RBM help keep it organized?
- Measuring the area and type of flooring
- Checking the substrate
- Dividing the work into zones
- Approving the finish and skirting
Stages of the work
- 01
Measuring and choosing the method
The contractor measures the area, taps the existing flooring and marks hollow or cracked areas. Together you decide whether to remove it or tile over it, and what the final floor height will be relative to doors and door frames.
- 02
Layout plan and ordering
Before ordering, a layout plan is prepared: where to start, which way the grout lines run and where the cuts will fall. The homeowner approves the layout, the grout line width and the quantity of tiles, including a reserve from the same production batch.
- 03
Demolition and removal
When removing, the old flooring and the layer underneath are taken up, and the debris is cleared as agreed. If exposed pipes, moisture or a crumbling substrate are found, work stops and you decide together how to deal with it before continuing.
- 04
Preparing and leveling the substrate
The substrate is leveled, weak areas are reinforced and slopes toward the drain are built on balconies and in wet areas. Before the first tile is laid, the contractor and the homeowner check the levels and the slope together.
- 05
Laying the tiles
The tiles are laid according to the approved layout, with an adhesive suited to the type and size of the tile, and flatness is checked as the work goes. If a damaged tile or a different shade turns up, the homeowner is told and a decision is made before it's laid.
- 06
Grout, skirting and cleaning
Once the adhesive dries, the grout lines are filled, skirting is installed and leftover material is cleaned off the tiles. At this stage you go over the floor together, mark repairs and approve the finish before the last payment.
What to check before you pay
- Tap the tiles in several spots in each room, and make sure there's no hollow sound that points to partial adhesion under the tile.
- Lay a long straightedge on the floor and check that there are no steps between neighboring tiles and that the surface is even across the whole room.
- Pour a little water on the balcony or the shower floor, and make sure it flows to the drain and doesn't pool in dips.
- Check that the grout lines are even in width and color in all the rooms, and that there are no cracks, holes or missing filling.
- Make sure all the doors open and close without rubbing on the new floor, and that the transitions between rooms are straight and neat.
Flooring price list by line item
8 line items · updated 11/2026
Tiling over an existing floor
190-300 ₪
per m² · Excludes tiles; requires a stable, level base.
New flooring on a sand bed
400-550 ₪
per m² · Includes removal, prep and basic installation; tiles are separate.
Floor removal and debris removal
60-130 ₪
per m² · Depends on flooring type, floor level and access.
Large-format tile flooring
250-450 ₪
per m² · Requires precision, leveling and the right tools.
Ceramic wall tiling
180-340 ₪
per m² · Kitchen, bathroom or decorative walls.
Baseboards
35-90 ₪
per meter · Includes standard cuts and joints.
Outdoor and balcony flooring
220-520 ₪
per m² · Depends on slopes, drainage and base.
Microcement
350-750 ₪
per m² · A specialty finish that depends heavily on surface prep.
Updated November 2026 · price varies by spec and site conditions
See the full price listQuestions about Flooring
Is tiling over the existing floor always cheaper?
Usually yes, because there's no removal, debris clearing or building a new substrate. But tiling over only works when the existing flooring is stable, level and not hollow, and when the extra height doesn't cause problems with doors, thresholds and the step into the shower. If doors need to be shortened or many areas reinforced, the price gap narrows. Ask the contractor to do a tap test before you decide. A common example: tiling over old flooring at the shower entrance creates a step, and then that area has to be removed anyway and a new slope built, so the savings are smaller than they first seemed.
What should be stated in a flooring quote?
The area of each room, whether the floor is removed or tiled over, who supplies the tiles and the adhesive, and what's included in preparing the substrate. Skirting, debris removal, special cuts and what happens if substrate problems are found should be listed too. That way you compare quotes on the same scope of work. Ask for quantities to be listed by room and not only as a total. If one quote includes removal, debris clearing and leveling the substrate and another only laying tiles, the cheaper one isn't necessarily better value, it simply includes less.
Can you live at home while the flooring is replaced?
You can, but it's hard to replace the flooring in the whole home at the same time. It's worth splitting the work into zones, clearing furniture from each zone before work starts there, and agreeing on how you'll move around the home while the fresh floor isn't ready to walk on. Removing flooring creates a lot of dust and noise, so plan for that too. If there are children or pets at home, close off the work area. It's also worth covering cabinet openings and air conditioners, because dust from removing flooring gets everywhere and lingers long after the work is done.
How many tiles should you order beyond the area?
Always order more than the net area, because some tiles get cut, broken or rejected. The extra quantity depends on the tile size, the shape of the rooms and the layout method, and a diagonal layout needs more. It's worth keeping a few tiles from the same series for future repairs, because a new batch may arrive in a different shade. Ask the contractor to calculate the quantity from the layout plan and not just the area, because in a room with lots of corners, niches and transitions the waste is greater. If an extra delivery of tiles arrives, check that the series and shade match the previous delivery.
What happens if a problem is found under the old flooring?
Sometimes old pipes, moisture or a crumbling substrate turn up. In that case, stop, take photos and get a written explanation from the contractor of the problem, the solution and the extra cost before continuing. If a leak is suspected, it's worth having a plumber check before closing up again. That way the decision is documented and there's no argument at the end about the extra. For example, if an old, crumbling pipe is found under the flooring, it's better to replace it now than to discover a leak after the new floor is already sitting on top of it.
How do you take care of the flooring after the work?
In the early period, avoid dragging furniture and aggressive washing until the grout has fully hardened. Keep the tile details, the spare tiles and the layout plan, so it's easy to replace a tile that breaks. With sensitive materials such as natural stone, ask the contractor how to clean it and whether it needs periodic treatment. If a tile cracks, replace it before the crack spreads. Felt pads under chairs and tables also prevent scratches, especially on glossy tiles and soft stone that scratches easily, even from a small grain of sand.
Related renovation work
Plumbing
350-25,000 ₪
by water points and scope of infrastructure02Electrical work
250-65,000 ₪
by points, panel and scope of prep03Waterproofing
120-450 ₪
per m², common jobs04Kitchen
35,000-180,000 ₪
per kitchen renovation, including related work05Doors and windows
1,500-40,000 ₪
by item and size06Carpentry and interiors
3,500-70,000 ₪
by item and custom carpentryRegistered renovation contractors by city
- Jerusalem992
- Tel Aviv-Yafo487
- Rishon LeZion410
- אום אל-פחם343
- Petah Tikva315
- Be'er Sheva294
- Nazareth282
- Netanya253
- Haifa252
- Ashkelon244
- Holon244
- Ramat Gan214
- Ashdod208
- Herzliya182
- Hadera171
- Rehovot164
- Kfar Saba161
- טייבה157
- עילוט149
- מעלה עירון136
- Hod HaSharon125
- Ra'anana124
- Bnei Brak117
- מג'דל שמס107

Looking for a contractor for flooring?
Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.
Build a project file