Painting

Painting that starts with preparing the walls

Good paintwork is decided before the can is opened: how many repairs the walls need, whether there's moisture or mold, and which paint suits each room. Most problems only show after drying, when light from the window reveals waves, stains or roller marks. Agree in advance on which rooms, ceilings, door frames and doors are included, what level of preparation each wall gets, and who moves and covers the furniture. That way you can compare quotes and check the result room by room.

Typical range

1,800-12,000 ₪

by number of rooms and amount of repairs

The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.

How much does it cost to paint an apartment in 2026?

In 2026, painting a 3-room apartment costs 3,000-5,500 ₪, a 4-room apartment 4,500-7,500 ₪ and a 5-room apartment 7,000-12,000 ₪, including VAT. Painting the ceiling adds 500-900 ₪ per room. The price goes up with the amount of repair work before painting: cracks, damp and peeling paint need filler and prep, so ask for the repairs to appear in the quote as a separate line item.

Worked examples

JobRange
3-room apartment, walls onlyPainting a 3-room apartment3,000-5,500 ₪
4-room apartment, walls and ceilings in five spacesPainting a 4-room apartment + Ceiling painting × 5 rooms7,000-12,000 ₪
5-room apartment, walls onlyPainting a 5-room apartment7,000-12,000 ₪
A 40 m² exterior wallExterior wall painting × 40 m²3,200-7,200 ₪

Where the figures come from: every range here is a line item in the RBM Contractors price list (version 2026.11, including VAT), and every example is a sum of line items times a quantity. The price list was checked against prices published in Israel on 14 November 2026. This is an estimate, not a quote.

What's usually included?

  • Preparing the walls
  • Crack repairs and filler
  • Painting walls and ceilings
  • Basic cleaning after the work
  • Coordinating colors and finish

What affects the price?

  • Condition of the walls
  • Number of coats of paint
  • Full skim coat or spot repairs
  • Painting ceilings and door frames
  • Access and furniture in the apartment

How does RBM help keep it organized?

  • Description of the wall condition
  • Agreeing on the paint specification
  • Documenting the areas to be done
  • Signing off room by room

Stages of the work

  1. 01

    Site visit and mapping the walls

    The painter goes through each room and marks cracks, peeling, damp stains and areas that need filler. At this stage you decide which walls get a spot repair and which get a full skim coat, and what's included in the price.

  2. 02

    Choosing shades and finish

    Choose a shade, sheen level and type of paint for each room, with suitable paint for wet rooms and the kitchen. It's worth asking for a sample on the wall itself and approving it in daylight and evening light before ordering the full quantity.

  3. 03

    Covering and protecting the home

    Furniture is moved to the middle of the room, floors, windows, outlets and door frames are covered, and tape is applied along the dividing lines. Agree in advance on who moves the furniture, what stays in the room and who is responsible if something gets dirty or scratched.

  4. 04

    Repairs, filler and primer

    Cracks and holes are filled, peeling areas are sanded and filler is applied where agreed, followed by a coat of primer. Before painting, go over the walls together in side lighting and confirm the surface is smooth enough with no bumps.

  5. 05

    Painting ceilings and walls

    Ceilings are painted before walls, door frames and doors are done last, and each coat is left to dry before the next one. After the last coat, the homeowner checks that the shade is even and that there are no areas where the old wall shows through.

  6. 06

    Cleaning and handover room by room

    Tape and covers are removed, paint stains are cleaned off floors, windows and outlets, and the furniture is put back. Handover is done room by room, and small touch-ups are marked with a sticker and closed before the last payment.

What to check before you pay

  • Check every wall in side lighting from the window or a flashlight, and look for waves, roller marks and areas where the paint looks faded.
  • Make sure the dividing lines between wall and ceiling and between wall and door frame are straight and clean, with no paint that has bled over.
  • Ask for the name of the shade and the type of paint used in each room, and keep them for future touch-ups.
  • Check that the floors, windows, outlets and handles are free of paint stains before you sign off on the room and the payment.
  • Ask to keep a small amount of each shade in a closed, labeled container, for touch-ups after the contractor leaves.

Painting price list by line item

9 line items · updated 11/2026

  • Painting a 1-room apartment

    1,000-2,400 ₪

    per apartment · Usually excludes the ceiling, doors or unusual repairs.

  • Painting a 2-room apartment

    1,600-3,600 ₪

    per apartment · Includes basic repairs and two coats of paint.

  • Painting a 3-room apartment

    3,000-5,500 ₪

    per apartment · A furnished apartment or walls in poor condition will be priced higher.

  • Painting a 4-room apartment

    4,500-7,500 ₪

    per apartment · Typical range for acrylic paint and minor repairs.

  • Painting a 5-room apartment

    7,000-12,000 ₪

    per apartment · Depends on area, ceilings, furniture and repairs.

  • Ceiling painting

    500-900 ₪

    per room · Includes labor and material for a standard room.

  • Ceiling whitewash

    15-35 ₪

    per m² · Suitable for ceilings in relatively good condition.

  • Exterior wall painting

    80-180 ₪

    per m² · Depends on access, plaster repairs and type of paint.

  • Epoxy tile refinishing

    1,200-3,500 ₪

    per wet room · Painting existing tiles or a bathtub instead of replacing them; an interim solution.

Updated November 2026 · price varies by spec and site conditions

See the full price list

Questions about Painting

What's the difference between regular painting and a full skim coat?

With regular painting, cracks and holes are repaired in spots and the existing wall is painted over. With a full skim coat, the entire wall surface is smoothed before painting, so the result is more even, but the work takes longer and costs more. On walls with many old repairs or waves, a full skim coat is sometimes the only way to get a clean finish. Ask the painter what level of preparation they recommend for each wall and why. For example, a living room wall that gets strong light from a large window will reveal every wave, so a full skim coat is more worthwhile there.

Does a furnished apartment make the job more expensive?

Sometimes, yes. In a furnished apartment, furniture has to be moved and covered, worked around and put back, and some walls are harder to reach. You can save by clearing shelves, pictures and small items in advance and gathering what you can into another room. Agree in the quote on who does this and what happens with heavy furniture. For example, a full bookcase or a built-in closet that can't be moved means painting around it or taking it apart, and that needs to be written down in advance. Send the contractor photos of the rooms as they are so the price is accurate.

Can you keep living at home while it's being painted?

Usually yes, if the work goes room by room and a bedroom is kept free. Water-based paints smell less, but ventilate well and keep children and pets out of a room being painted. Agree in advance on the order of the rooms, so you know at every stage where you can sleep and work. Plan ahead where the furniture from the room being painted will go, so it doesn't block passageways. For example, painting a child's room should be planned so there's time to air it out well before the children go back to sleeping in it. Keep the room's door closed during the work.

What do you do about damp stains or mold before painting?

Paint doesn't fix moisture, so first find out where it's coming from: pipes, waterproofing, a window or condensation. Once the source has been dealt with and the wall is dry, the mold is cleaned off, a suitable primer is applied, and only then is it painted. Painting over a damp wall will bring the stain back very quickly. If the source isn't clear, it's worth bringing in a leak detection professional before painting. For example, a black stain in the corner of a bathroom ceiling often comes from poor ventilation rather than a leak, and the solution starts with a fan, not paint. Open a window after showering.

How do you compare painting quotes?

Check that all the quotes include the same rooms, ceilings, door frames and doors, and that they state the level of preparation: spot repairs or a full skim coat. It's also important to know who supplies the paint, how many coats are included and who moves and covers the furniture. A cheap quote with no written preparation usually shows on the walls. Ask to see an example of the painter's previous work too. For example, a quote that doesn't mention ceilings or door frames may leave them in the old shade, and the difference will show right next to the new wall. Ask for them to be listed by name.

How do you take care of the walls after painting?

At first the paint is still curing, so avoid heavy cleaning and pushing furniture against the wall. Wipe light stains with a damp sponge and no abrasive products. For touch-ups, use the same shade and the same sheen level, in a thin coat, so the repair doesn't stand out on the wall. In the kitchen and bathrooms, check now and then that there are no mold stains in the corners. For example, a wet wipe with a strong cleaner leaves a shiny patch on matte paint that's hard to get rid of, so test first in a hidden spot. Washable paint can be wiped more often.

Related renovation work

Registered renovation contractors by city

Search for a contractor by name or contractor number

Looking for a contractor for painting?

Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.

Build a project file

We use cookies to improve your experience.