Bathroom renovation
A more organized bathroom renovation
A bathroom renovation usually includes demolition, plumbing, waterproofing, wall tiling, floor tiling, sanitaryware and finishes, and each stage has a fixed order that can't be skipped. Because it's a wet room, most problems that show up a year later start in stages that are already covered by tiles: pipes, slopes and waterproofing. That's why it pays to agree in advance on a written specification, the locations of the water points and the choice of tiles, and to ask for documentation of every layer before it's covered. That way you can compare quotes on the same basis and know exactly what you're paying for at each stage.

18,000-65,000 ₪
per standard bathroom
The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.
How much does a bathroom renovation cost in 2026?
In 2026, a basic bathroom renovation with no major infrastructure changes costs 18,000-35,000 ₪ per room, including VAT. An extended renovation with new infrastructure, wall tiling and finishes costs 35,000-65,000 ₪. What moves the price most is what's hidden under the tiles: wet room waterproofing costs 3,000-5,500 ₪, and each water and drain point adds another 1,200-2,000 ₪. The ranges don't include sanitaryware or expensive tiles.
Worked examples
| Job | Range |
|---|---|
| A 4-5 m² bathroom, basic renovationBasic bathroom renovation | 18,000-35,000 ₪ |
| The same room with the shower moved and new infrastructureExtended bathroom renovation | 35,000-65,000 ₪ |
| Replacing the floor and wall tiles only, without touching the pipesStrip out an existing bathroom + Wet room waterproofing + Ceramic floor and wall tiling × 20 m² | 10,000-24,000 ₪ |
| Replacing the concealed shower valve and the toiletConcealed shower valve installation + Sanitaryware installation | 2,900-6,000 ₪ |
Where the figures come from: every range here is a line item in the RBM Contractors price list (version 2026.11, including VAT), and every example is a sum of line items times a quantity. The price list was checked against prices published in Israel on 14 November 2026. This is an estimate, not a quote.
What's usually included?
- Demolition and removal
- Plumbing and water points
- Wet room waterproofing
- Floor and wall tiling
- Installing sanitaryware and finishes
What affects the price?
- Condition of the existing pipes
- Size of the bathroom
- Type of tiles and sanitaryware
- Access and debris removal
- Moving water points
How does RBM help keep it organized?
- Description of the current condition, with photos
- Scope of work before the quote
- Work stages and payments
- Documenting decisions and changes
Stages of the work
- 01
Site visit, measuring and specification
The contractor checks the condition of the pipes, drainage and walls, measures the room and breaks your requests down into line items. At this stage you decide what stays in place, what moves, and who buys the tiles and sanitaryware.
- 02
Demolition and removal
Sanitaryware, wall tiling and flooring are removed down to the substrate, and the debris is cleared as agreed. After demolition you can see the real condition of the pipes and floor, and this is the moment to approve in writing any repair that wasn't known in advance.
- 03
Plumbing and water points
New water and drain pipes are laid according to the locations of the fixtures you chose, and they are pressure tested before being closed up. This is where you give final approval for the height of the faucets, the position of the shower drain and the toilet connection.
- 04
Waterproofing and flood test
Once the pipes are closed up, waterproofing is applied to the floor and to the walls in the shower area, and the room is left flooded for testing before any tiling. At this stage you decide together who checks the result and how it's documented.
- 05
Flooring, slopes and wall tiling
The floor is tiled with a slope toward the drain, and the walls are tiled according to the agreed layout. Before starting, you approve the starting point for the tiles, so narrow cuts don't end up in the most visible spot in the room.
- 06
Sanitaryware and accessories
The toilet, sink, vanity, faucets and shower enclosure or bathtub are installed and connected to the prepared points. The homeowner checks that the installed models are the ones that were chosen, with no scratches or missing parts.
- 07
Finishing, cleaning and handover
Grout, silicone, paint touch-ups and cleaning are completed, and every faucet and drain is run in front of the homeowner. At handover, a snag list of open repairs is agreed in writing and you receive the photos and documents for the job.
What to check before you pay
- Ask for photos of the new pipes and the pressure test before the walls and floor are closed up.
- Ask for dated photos of the waterproofing and the flood test before the floor is covered.
- Pour water on the shower floor and check that it flows to the drain and doesn't pool in the corners.
- Look over the tiles in side lighting for raised tiles, uneven grout lines and crooked cuts.
- Run every faucet on hot and cold, flush the toilet and check there's no dripping under the sink.
- Make sure the silicone around the shower, bathtub and sink is continuous and clean, with no gaps and no stains.
Bathroom renovation price list by line item
8 line items · updated 11/2026
Strip out an existing bathroom
2,000-4,500 ₪
per room · Includes removing sanitaryware and tiling, excluding unusual debris removal.
Wet room waterproofing
3,000-5,500 ₪
per room · Depends on size, waterproofing layers and the flood test.
Ceramic floor and wall tiling
250-700 ₪
per m² · Labor and prep; special or large tiles cost more.
Water and drain point
1,200-2,000 ₪
per point · Depends on chiseling, access and connection to existing infrastructure.
Concealed shower valve installation
2,400-3,200 ₪
per unit · Excludes the faucet, tiles or unusual infrastructure changes.
Sanitaryware installation
500-2,800 ₪
per item · Sink, toilet, vanity, shower enclosure or bathtub.
Basic bathroom renovation
18,000-35,000 ₪
per room · No major infrastructure changes and no high-end finishes.
Extended bathroom renovation
35,000-65,000 ₪
per room · Includes infrastructure, wall tiling, finishes and coordinating tradespeople.
Updated November 2026 · price varies by spec and site conditions
See the full price listQuestions about Bathroom renovation
How long does a bathroom renovation take?
The length of the job depends on the scope of demolition, the infrastructure, the waterproofing and the finishing materials. It's important to get an estimated schedule from the contractor broken down by stage, including waiting times such as waterproofing drying, the flood test and the arrival of special-order tiles or fixtures. A stage-by-stage schedule lets you know when each payment is due and what's holding things up if there's a delay. It's also worth agreeing in advance on what happens if old pipes that need replacing are found after demolition, because that's the most common reason the schedule changes.
Why does waterproofing affect the price?
Waterproofing a wet room requires preparing the substrate, suitable materials and a test before it's covered. Skipping this stage can be expensive later, because a leak under the flooring usually shows up at the neighbors' or in an adjacent wall, and then everything already invested has to be torn out again. In the quote, you should see waterproofing as a separate line item, with the area being treated and the flood test, and not as a general part of the flooring.
What should you see before tiling over the waterproofing?
You should see that the waterproofing goes up the walls in the shower area and doesn't stop at the floor, that the corners and the transitions around the drain are treated, and that the flood test ended without signs of moisture. Ask for dated photos of all of these, because after tiling you can no longer check them by eye. If something isn't clear in the photos, now is the time to ask, before the work moves on to the next stage.
Can you live at home during a bathroom renovation?
In most cases yes, if there's another bathroom in the home or a temporary solution. Agree in advance on which days the water will be shut off, how the hallway and the flooring along the way will be protected, and where materials will be stored so the home stays livable. In an apartment with only one bathroom, it's worth planning the hard days in advance, around demolition and plumbing. It's also a good idea to empty nearby cabinets ahead of time and cover air vents, because demolition dust travels farther than you'd think.
Can you move the shower, toilet or sink to a different spot?
Usually yes, but moving a drain affects the slopes, the floor height and sometimes the building's shared pipes. The toilet is especially sensitive, because it depends on the connection to the main drain line. Ask the contractor to check the route after demolition and to price the move as a separate line item, before you order fixtures. If the move isn't possible, the contractor should explain why and suggest an alternative before going ahead.
How do you choose bathroom tiles?
For the floor, and especially the shower, choose a tile that isn't slippery when wet. Large tiles mean fewer grout lines, but they're harder to fit to the slope toward the drain, so a smaller tile is sometimes used in the shower. Order a little more than the area you need, from the same series, so you have spares if a tile breaks. It's worth seeing the tile in the room's own lighting before ordering, because a shade that looks light in the store can look different in a bathroom without a window.
Who buys the tiles and sanitaryware?
Some contractors include materials in the quote and some price labor only. If you're buying yourself, agree with the contractor on when everything needs to be on site and who checks that the quantities and sizes are right. A fixture that arrives late or in the wrong size stops the work at a stage that can't be skipped. It's worth writing into the agreement who is responsible if an item you supplied arrives damaged.
What should you keep after the renovation is finished?
Keep the photos of the pipes and waterproofing before they were covered, the final specification, the model names of the fixtures and faucets, and the name of the tile series. If you ever need to fix a leak or replace a tile, the photos show where the pipes run, and the names save you hunting for a matching tile. It's also worth keeping the snag list from handover and the date each item on it was closed.
Related renovation work
Apartment renovation
90,000-420,000 ₪
per apartment, partial to extensive renovation02Private house renovation
1,500-6,500 ₪
per m², by scope and finish level03Demolition and removal
1,500-35,000 ₪
by scope of demolition and removal04Painting
1,800-12,000 ₪
by number of rooms and amount of repairs05Plaster and skim coat
75-650 ₪
per m², by finish type06Drywall
280-650 ₪
per m², typical workRegistered renovation contractors by city
- Jerusalem992
- Tel Aviv-Yafo487
- Rishon LeZion410
- אום אל-פחם343
- Petah Tikva315
- Be'er Sheva294
- Nazareth282
- Netanya253
- Haifa252
- Ashkelon244
- Holon244
- Ramat Gan214
- Ashdod208
- Herzliya182
- Hadera171
- Rehovot164
- Kfar Saba161
- טייבה157
- עילוט149
- מעלה עירון136
- Hod HaSharon125
- Ra'anana124
- Bnei Brak117
- מג'דל שמס107

Looking for a contractor for bathroom renovation?
Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.
Build a project file