Shared buildings and stairwells
Shared buildings and stairwells, coordinated with the residents
A renovation of common property includes the stairwell, lobby, mailboxes, intercom, lighting and facade, and all the decisions go through the building's representatives, not through a single resident. The work is done while everyone keeps living in the building, so the common problems are a blocked passage, dust at the apartment entrances, paint smeared on doors and arguments between residents about what was agreed. Before asking for quotes, agree on a single specification in the committee, who approves payments and how residents are updated on each stage.
1,500-80,000 ₪
by scope and number of floors
The range is a ballpark only. The final price is set after inspecting the property, the scope of work, the finishing materials and site conditions.
What's usually included?
- Preparations and repairs
- Paint and wall finishes
- Flooring and stairs
- Lighting and infrastructure
- Cleaning and handover
What affects the price?
- Size of the areas
- Existing condition
- Access and resident traffic
- Working hours
- Coordination with the building
How does RBM help keep it organized?
- Survey of common areas
- Coordinating phases with residents
- Tracking the work and cleaning
- Sign-off with the committee
Stages of the work
- 01
Survey of the existing condition
The contractor goes through every floor with a committee representative, photographs the walls, stairs, railings, lighting and mailboxes and marks areas with damp or cracks. At this stage you decide what goes into the work and what is left for a later stage.
- 02
Specification and committee decision
A single specification is prepared with colors, materials and line items, so all the quotes are on the same basis. The committee approves the specification and the chosen quote, and it is worth documenting the decision and sharing it with all the residents.
- 03
Notice to residents
Before work starts, a notice is posted at the entrance and sent to residents saying when each floor will be worked on, when passage is restricted and who the contact person for complaints is. For residents with special needs, such as an older person or a baby stroller, an access solution is arranged in advance.
- 04
Repairs and preparations
Loose plaster, cracks and damp damage are dealt with, and first of all the source of the damp if it is known. Here the committee representative approves the actual extent of the repairs, because damage that was not visible in the survey often turns up.
- 05
Paint, flooring and lighting
Painting is done, stair flooring is replaced or polished, and lighting with sensors, mailboxes or an intercom are installed according to the specification. The committee representative approves each finished floor before moving on to the next, and the apartment doors are protected from paint and dust.
- 06
Cleaning and handover to the committee
At the end the whole stairwell and lobby are cleaned, covers are removed and paint stains are cleaned off doors and door frames. The committee goes over a defect list with the contractor, and makes the final payment only after it has been closed.
What to check before you pay
- Walk every floor and check that there are no paint stains on the apartment doors, the railings or the stairwell windows.
- Turn on the lighting on every floor in the evening, and make sure the sensors respond and there is no dark area between floors.
- Check that the stair railing is stable along its whole length, and that the repaired steps do not slip or move when stepped on.
- Ask the contractor for a list of the materials and colors used, and keep it with the committee for future repairs.
- Make sure every resident can open their mailbox and that the intercom works from every apartment, before the final payment.
Shared buildings and stairwells price list by line item
7 line items · updated 11/2026
Stairwell painting (3-4 floors)
4,000-9,000 ₪
per project · Includes basic filler repairs; walls in poor condition cost more.
Stairwell plaster and damp repairs
2,500-12,000 ₪
per project · Depends on the source of the damp and how much is peeling.
Entrance lobby renovation
15,000-80,000 ₪
per project · Flooring, cladding, lighting, entrance door and mailboxes, per spec.
Mailbox replacement
1,500-4,500 ₪
per set · By number of residents and installation type.
Building intercom
4,000-15,000 ₪
per system · Audio or video, by number of apartments and existing wiring.
LED lighting with sensors
250-500 ₪
per point · Replacing existing fixtures; new infrastructure is separate.
Building facade renovation
150-450 ₪
per m² · Initial range; scaffolding, engineer and approvals are separate.
Updated November 2026 · price varies by spec and site conditions
See the full price listQuestions about Shared buildings and stairwells
How do you coordinate a renovation of common property?
Start with a committee decision on the scope and specification, then get quotes on the same basis and send an orderly notice to the residents. During the work, one contact person from the committee deals with the contractor, approves changes and updates the residents. That way you avoid a situation where each resident gives different instructions and nobody knows what was agreed. It is also worth deciding in advance how residents' complaints are handled during the work, for example through the building's message group, where only the contact person passes requests on to the contractor.
What is important to check in a stairwell renovation?
Safety first: a stable railing, stairs that are not slippery and lighting that covers every floor. Then the condition of the walls and any damp, because paint on a damp wall will peel quickly. Also check the passage for strollers and wheelchairs at the entrance and the condition of the mailboxes and intercom, and decide what goes into the same job. A recurring example is painting a whole stairwell without dealing with a window that lets rain in, and then the wall under the window peels again by the next winter, and the money spent on paint is wasted.
What do you do when some residents object or do not pay?
Resolve it before signing with a contractor, not in the middle of the work. The committee presents the quotes and the specification to the residents, documents the decision and how the payment is split, and starts only when the money for the first stage is in place. If a dispute cannot be resolved, consult a qualified professional in shared building management. A common mistake is starting the work when only part of the money has been collected, and then stopping halfway with a half-painted stairwell and residents blaming each other, while the contractor waits to be paid.
How do you keep safe access to the building during the work?
Always leave a clear path on the stairs, do not store materials in the way, and mark areas with fresh paint or wet flooring. Work that blocks the entrance is scheduled for hours when fewer residents are coming and going. The contractor should leave the building tidy every time the crew leaves, including cleaning the passage. If the building has an elevator, agree when it is used to move materials, how its walls and floor are protected and who inspects it at the end of the work together with the committee representative.
How do you compare quotes for a shared building renovation?
Send all the contractors the same specification and ask for a price by line item: plaster repairs, paint, flooring, lighting, mailboxes and intercom. Check whether the quote includes protecting doors and railings, cleaning and debris removal. Ask to see a building the contractor has worked in, and ask the committee there how the coordination with residents went. Watch out for a quote that lists only paint for the whole building with no breakdown of plaster repairs, because that is usually where the extras that come later are hiding, once the work is already halfway done.
What should the committee keep once the work is finished?
The specification, the signed quote, the receipts, the list of materials and colors, and before and after photos. These documents help when a new committee is elected, when a spot repair is needed or when damp appears again in the same place. Keep them somewhere all the committee members can access, not with just one resident. Also record the contractor's details with the committee, along with what was agreed about handling defects found later, so a future committee knows who to contact and exactly what was agreed.
Related renovation work
Labor rates and tradespeople
150-2,200 ₪
per hour or workday02Bathroom renovation
18,000-65,000 ₪
per standard bathroom03Apartment renovation
90,000-420,000 ₪
per apartment, partial to extensive renovation04Private house renovation
1,500-6,500 ₪
per m², by scope and finish level05Demolition and removal
1,500-35,000 ₪
by scope of demolition and removal06Painting
1,800-12,000 ₪
by number of rooms and amount of repairsRegistered renovation contractors by city
- Jerusalem992
- Tel Aviv-Yafo487
- Rishon LeZion410
- אום אל-פחם343
- Petah Tikva315
- Be'er Sheva294
- Nazareth282
- Netanya253
- Haifa252
- Ashkelon244
- Holon244
- Ramat Gan214
- Ashdod208
- Herzliya182
- Hadera171
- Rehovot164
- Kfar Saba161
- טייבה157
- עילוט149
- מעלה עירון136
- Hod HaSharon125
- Ra'anana124
- Bnei Brak117
- מג'דל שמס107

Looking for a contractor for shared buildings and stairwells?
Build a project file with a cost range, milestones and terms, and send it to contractors who work in an organized way.
Build a project file