Quote example
Plumbing quote: an example with line items for contractors
A plumbing quote has to separate pipes, water points, drainage and fitting fixtures, and say what is tested before the walls are closed. The example has 6 items for replacing the pipes and water points. Next to them is the range from RBM's public price list, and you set your own price.

- Strong security
- Hebrew, Russian and English
- Works on computer and phone
- Personal help getting set up
The items in the quote: replacing the pipes and water points
The items in the order the work is done. The quantities are a starting point you correct after measuring. The range in the last column is from RBM's public price list, not your price.
| Section | Item | Quantity | Unit | Range in RBM's price list |
|---|---|---|---|---|
| Pipes | Replacing the water pipes in the apartment | 1 | lump sum | ₪8,000-25,000 per apartment |
| Manifold | Installing a water manifold | 1 | unit | ₪1,800-2,800 per unit |
| Points | New water points | 3 | point | ₪1,200-1,800 per point |
| Drainage | New drainage points | 2 | point | ₪800-1,600 per point |
| Fixtures | Installing a concealed cistern, toilet priced separately | 1 | unit | ₪2,000-3,200 per unit |
| Testing | Pressure test of the pipes before the walls are closed | 1 | lump sum | not in the price list |
- Pipes
- Item
- Replacing the water pipes in the apartment
- Quantity
- 1
- Unit
- lump sum
- Range in RBM's price list
- ₪8,000-25,000 per apartment
- Manifold
- Item
- Installing a water manifold
- Quantity
- 1
- Unit
- unit
- Range in RBM's price list
- ₪1,800-2,800 per unit
- Points
- Item
- New water points
- Quantity
- 3
- Unit
- point
- Range in RBM's price list
- ₪1,200-1,800 per point
- Drainage
- Item
- New drainage points
- Quantity
- 2
- Unit
- point
- Range in RBM's price list
- ₪800-1,600 per point
- Fixtures
- Item
- Installing a concealed cistern, toilet priced separately
- Quantity
- 1
- Unit
- unit
- Range in RBM's price list
- ₪2,000-3,200 per unit
- Testing
- Item
- Pressure test of the pipes before the walls are closed
- Quantity
- 1
- Unit
- lump sum
- Range in RBM's price list
- not in the price list
What the quote must say
Points by type. A water point and a drainage point are priced differently. A count in the quote prevents an argument about "one more small point".
The type of pipe. Write which pipes you install and whether there is a manifold. That is what the client compares between quotes.
Pressure test. Before the walls are closed. Write that it is part of the job.
Sanitary fixtures. Fitting only fixtures the client bought, or supplying them as well. Write which.
- Tiling, 62 m²₪18,600
- Water pipes₪9,400
- Electrical and lighting₪12,150
What to write under "not included"
Whatever is not written down as included or not included becomes an argument at the end of the job. Three items that come up again and again in this work:
- Closing up and finishing
- If another contractor closes up, plasters and tiles afterwards, write that it is not included.
- A hidden leak that turns up
- Repairing old pipes outside the scope of the work is priced separately.
- The fixtures themselves
- The toilet, basin and taps are bought by the client, unless written otherwise.
Frequently asked questions
How much does replacing the pipes in an apartment cost?
In RBM's price list, replacing all the water pipes in an apartment is ₪8,000-25,000 per apartment, depending on the size of the apartment, the number of wet rooms and access. Finishing repairs are separate.
How much does a water point cost?
In RBM's price list, installing a water point is ₪1,200-1,800 per point, and a drainage point ₪800-1,600 per point, with easy access and no complex chasing.
How does the client sign the quote from their phone?
In RBM you send the client a link on WhatsApp. It opens on their phone, they go through the quote and sign with a finger. The signature is saved with a timestamp and the exact version that was signed, so at the end of the job it is clear what they agreed to.
Where the ranges come from
The ranges are from RBM's renovation price list. They are not a quote and not your price; they help you explain the items to the client.

Your next quote, without starting from a blank page